Progress feed:
15925 Aparados Way
← Back to Home Details
  • Posted by Jeff Click  |  Feb 8, 2021 - 4:53pm
    Winter Weather & What To Do
    With this week's incoming weather, I'd like to offer some advice on how best to prepare and protect your home from its effects. These are simple but important tasks to perform to prevent inconveniences and potential harm that extreme temperatures can bring to homes, including new ones.

    1) Disconnect all exterior hoses from the faucets. Your exterior faucets (called hose bibs) are designed to withstand the elements of harsh weather. However, having a hose connected dramatically increases the potential for water within the hose to freeze and expand into the inner portions of the hose bib, potentially rupturing its supply pipe. Simply disconnecting the hose is the best way to prevent this.

    2) Close that garage door. During nicer weather, it's not unusual for some to be in the habit of leaving the overhead door up for a bit into the evening. However, during extremely colder temperatures, doing so will increase the load on your home's energy performance, causing your HVAC system to have to work harder to keep your home comfortable. You also risk forgetting to close the door overnight, which exposes the plumbing to and from your hot water closet to potential freezing and rupturing.

    3) Test that heat & fireplace. When going into Fall, it's always a good idea to test your heater(s) and fireplace before you actually need them. That way if something isn't working properly it can be addressed before it beomes an urgent need. Run your heater(s) for a few minutes to ensure they are emitting warm air, and don't be alarmed if you smell a hint of a burning smell. This is simply the result of burning off dust on the coils that haven't been hot for a while.

    4) Replace those filters. When your heater can breath better, it heats better. If you haven't changed your air filters at the returns in the past 30 days, you definitely want to do that to help make way for maximum airflow and energy performance (which results in greater comfort.). Remember, don't buy the expensive ones. Get mid-level ones from Lowe's and change them often (every 30 days is the best practice).

    5) Be aware of plumbing on exterior walls. If you have any bathroom sinks or shower/tub faucets that are on exterior walls, there are a couple of techniques you'll want to be aware of when temps are expected to dip into the teens or below. For any bathroom sinks on exterior walls, leave the cabinet doors open that are underneath the sink to provide better warm air to circulate. For both sinks and tubs/showers on exterior walls, it may also be necessary to turn on the faucets to a slow drip during extreme temperatures, as moving water helps prevent freezing.

    6) Turn off your yard's irrigation system if you have one. This is easy to do, and involves two steps: 1) Turn your controller to off. Your controller is mounted on the inside wall of your garage. In most models, this is simply a dial that you turn to the "Off" position. Turning off prevents the controller from telling your solenoid valves to turn on/off unnecessarily. This is known as dry-firing since it's turning the valves on when water isn't present. 2) Turn off the water supply to the system by turning off a valve at your backflow preventer, which is usually inside your hot water tank closet. You have two valves similar to the blue levers shown below, and turning one of them perpendicular to the pipe will turn off the water supply to the system. (Reverse this process in the spring, or any time temperatures get back into the range of needing to water your landscape.)

    A typical bakcflow preventer, located within your hot water closet.


    Accomplishing these simple tasks will go a long way towards making wintery weather more bearable. Don't forget to start the coffee maker! | jC
  • Marked as complete by Jeff  |  Sep 29, 2020 - 10:14am

    Master Bathroom Low Pressure

  • Marked as complete by Jeff  |  Sep 29, 2020 - 8:58am

    Defective Irrigation Head & Dead Shrub

  • Marked as complete by Jeff  |  Sep 10, 2020 - 10:54am

    Fix Keypad & Adjust Door

  • New task added by Jeff  |  Sep 8, 2020 - 12:35pm

    Master Bathroom Low Pressure

  • New task added by Jeff  |  Sep 8, 2020 - 12:34pm

    Defective Irrigation Head & Dead Shrub

  • New task added by Jeff  |  Sep 8, 2020 - 12:30pm

    Fix Keypad & Adjust Door

  • Marked as complete by Jeff  |  May 20, 2020 - 8:53am

    Troubleshoot Tripping Breaker

  • New task added by Jeff  |  May 15, 2020 - 8:38am

    Troubleshoot Tripping Breaker

  • Marked as complete by Jeff  |  May 15, 2020 - 8:37am

    Assess Head Operation & Coverage

  • New task added by Jeff  |  Apr 28, 2020 - 10:26am

    Assess Head Operation & Coverage

  • Marked as complete by Jeff  |  Apr 28, 2020 - 10:25am

    Program 1 Garage Door Remote

  • Marked as complete by Jeff  |  Apr 28, 2020 - 9:57am

    Assess Excessive Sewer Smell at Kitchen Sink

  • New task added by Jeff  |  Apr 23, 2020 - 8:42am

    Program 1 Garage Door Remote

  • Scheduled by Jeff  |  Apr 21, 2020 - 9:33am

    Assess Excessive Sewer Smell at Kitchen Sink

  • New task added by Jeff  |  Apr 21, 2020 - 9:32am

    Assess Excessive Sewer Smell at Kitchen Sink

  • Marked as complete by Jeff  |  Apr 17, 2020 - 9:26am

    Pre-Closing Walk-Through Punch Items Completed

  • Marked as complete by Jeff  |  Apr 13, 2020 - 5:22pm

    Final-Final Clean

  • Marked as complete by Jeff  |  Apr 13, 2020 - 5:22pm

    Paint Touch Up Kit Created & Neatly Stored In Utility Room

  • Marked as complete by Jeff  |  Apr 13, 2020 - 5:22pm

    Flooring Punch List

  • Marked as complete by Jeff  |  Apr 13, 2020 - 9:01am

    Trim & Hardware Punch List

  • Marked as complete by Jeff  |  Apr 13, 2020 - 9:01am

    Cabinetry Punch List

  • Marked as complete by Jeff  |  Apr 13, 2020 - 9:01am

    Plumbing Punch List

  • Marked as complete by Jeff  |  Apr 13, 2020 - 9:01am

    Electrical Punch List

  • Marked as complete by Jeff  |  Apr 13, 2020 - 9:00am

    Misc. Punch Items Needing Addressed

  • Marked as complete by Jeff  |  Apr 13, 2020 - 9:00am

    Window & Exterior Door Punch List

  • Marked as complete by Jeff  |  Apr 13, 2020 - 9:00am

    Cabinet Final & Adjustments

  • Marked as complete by Jeff  |  Apr 9, 2020 - 1:17pm

    Flowerbed Debris & Weed Removal & Mulch Refreshment

  • Marked as complete by Jeff  |  Apr 9, 2020 - 1:17pm

    Garage Baseboards, Doors, & Casings Wiped Down Post-Power Wash

  • Marked as complete by Jeff  |  Apr 9, 2020 - 1:17pm

    Surplus Tile Materials Gathered & Stored For Future Use

  • Marked as complete by Jeff  |  Apr 9, 2020 - 1:17pm

    Garage, Drive, & Flatwork Power-Washing

  • Marked as complete by Jeff  |  Apr 9, 2020 - 1:17pm

    Concrete Flooring Final

  • Marked as complete by Jeff  |  Apr 8, 2020 - 3:56pm

    Permanent Keys Delivery & Secure Storage

  • Marked as complete by Jeff  |  Apr 7, 2020 - 2:50pm

    Punch Lists Entered in CB & Transmitted To Respective Contractors

  • Marked as complete by Jeff  |  Apr 7, 2020 - 2:49pm

    Carpet Installation

  • Marked as complete by Jeff  |  Apr 7, 2020 - 2:49pm

    Masonry Punch List

  • Marked as complete by Jeff  |  Apr 7, 2020 - 2:49pm

    Solid Surface Counter Top Punch List

  • Marked as complete by Jeff  |  Apr 7, 2020 - 2:49pm

    Laminate Counter Top Punch List

  • Marked as complete by Jeff  |  Apr 7, 2020 - 2:49pm

    Paint Punch List

  • Marked as complete by Jeff  |  Apr 7, 2020 - 2:49pm

    Certificate of Occupancy Issued

  • Marked as complete by Jeff  |  Apr 7, 2020 - 11:00am

    Debris & Materials Removed & Dirt Smoothed On Any Adjacent Property

  • Marked as complete by Jeff  |  Apr 7, 2020 - 11:00am

    Carpet Installation

  • Marked as complete by Jeff  |  Apr 7, 2020 - 11:00am

    HVAC Punch List

  • Marked as complete by Jeff  |  Apr 7, 2020 - 11:00am

    Glass & Mirror Punch List

  • Marked as complete by Jeff  |  Apr 7, 2020 - 11:00am

    Carpet Installation

  • Marked as complete by Jeff  |  Apr 7, 2020 - 11:00am

    Plumbing Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Apr 7, 2020 - 10:59am

    Exterior Cornice & Trim Painting

  • Phase Completed!  |  Apr 7, 2020 - 10:59am

    Exterior Detail

  • Marked as complete by Jeff  |  Apr 7, 2020 - 10:59am

    Seamless Guttering Installation

  • Marked as complete by Jeff  |  Apr 7, 2020 - 10:59am

    Window & Door Lintels Painted

  • Marked as complete by Jeff  |  Apr 4, 2020 - 3:13pm

    Electrical Final Inspection

  • Marked as complete by Jeff  |  Apr 2, 2020 - 1:35pm

    Preliminary Detail Clean

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:27pm

    Carpet Installation Scheduled

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:27pm

    Blank-Plating of Media Wiring JCH-Verified

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:27pm

    Surplus Trim Material Pick-Up

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:27pm

    Cosmetic Surface Repair Punch List

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:26pm

    HVAC Final Inspection

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:26pm

    Building Final Inspection Requested

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:26pm

    Zoning Final Inspection Requested

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:26pm

    Plumbing Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:26pm

    Air Conditioning System Charged & JCH Verified

  • Marked as complete by Jeff  |  Apr 1, 2020 - 7:26pm

    Kitchen Vent Hood Installation

  • Marked as complete by Jeff  |  Apr 1, 2020 - 3:23pm

    Tech & Media Punch List

  • Marked as complete by Jeff  |  Apr 1, 2020 - 3:02pm

    Zoning Final Inspection

  • Marked as complete by Jeff  |  Apr 1, 2020 - 3:02pm

    Building Final Inspection

  • Marked as complete by Jeff  |  Apr 1, 2020 - 3:02pm

    Plumbing Final Inspection

  • Marked as complete by Jeff  |  Apr 1, 2020 - 9:56am

    Glass & Mirror Installation

  • Marked as complete by Jeff  |  Apr 1, 2020 - 9:56am

    Window Screen Installation

  • Marked as complete by Jeff  |  Mar 31, 2020 - 4:23pm

    HVAC Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Mar 31, 2020 - 3:55pm

    Electrical Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Mar 31, 2020 - 10:08am

    Attic Insulation Installation

  • Marked as complete by Jeff  |  Mar 31, 2020 - 9:33am

    Drywall Punch List

  • Marked as complete by Jeff  |  Mar 30, 2020 - 4:04pm

    Security, Media, & Tech Final

  • Marked as complete by Jeff  |  Mar 30, 2020 - 9:04am

    Garage Door Opener Installation

  • Marked as complete by Jeff  |  Mar 30, 2020 - 9:03am

    Final Site Debris Clean-Up

  • Scheduled by Jeff  |  Mar 27, 2020 - 3:09pm

    Drywall Punch List

  • Marked as complete by Jeff  |  Mar 26, 2020 - 2:12pm

    Electrical & Lighting Final Installation

  • Marked as complete by Jeff  |  Mar 25, 2020 - 1:06pm

    Fireplace Final Installation

  • Marked as complete by Jeff  |  Mar 25, 2020 - 12:06pm

    Appliance Package Delivery

  • Marked as complete by Jeff  |  Mar 25, 2020 - 11:53am

    Hardware Installation

  • Marked as complete by Jeff  |  Mar 25, 2020 - 11:53am

    Plumbing Final Installation

  • Marked as complete by Jeff  |  Mar 25, 2020 - 11:52am

    Lighting Fixture Package Delivery

  • Scheduled by Jeff  |  Mar 23, 2020 - 2:29pm

    Glass & Mirror Installation

  • Marked as complete by Jeff  |  Mar 23, 2020 - 1:42pm

    Sewer Clean-Out Cut-Down & Capping

  • Marked as complete by Jeff  |  Mar 23, 2020 - 1:42pm

    Water Meter Adjustment (or N/A)

  • Marked as complete by Jeff  |  Mar 23, 2020 - 1:42pm

    Yard Debris & Flag Removal

  • Marked as complete by Jeff  |  Mar 23, 2020 - 1:41pm

    Exterior Door Weather Stripping & Threshold Adjustment

  • Marked as complete by Jeff  |  Mar 23, 2020 - 1:41pm

    Address Panel Installed

  • Marked as complete by Jeff  |  Mar 23, 2020 - 1:41pm

    Exterior Facade Expansion Joint Sealing

  • Posted by Jeff Click  |  Mar 20, 2020 - 1:40pm
    Progress Update
    Wow. Sigh. Oh, boy. All things I’m sure we’ve all said over the past week as our world has turned seemingly upside down.

    I hope this post finds you and yours well amidst all of this. I want to update you on what effects I’m seeing in the construction world right now and how it’s impacting progress on your home.

    To date, nearly all aspects of construction are still operating reasonably as-scheduled, with exception to those processes that are affected by the weather. I’ve only seen delays from a few product categories as of the time of this post related to the health crisis.

    The Clickbuild.io system, which I use to manage my projects and keep you apprised of progress, is proving invaluable as many move to a remote working mode, as nearly all of my trades and suppliers work well with me in being responsive in communication and scheduling. I will continue to work diligently and responsibly to maintain the production schedule as best I can, though there are many moving parts comprised of a labor force who depends on work to sustain their own lives, but who also make independent decisions about their response to this.

    I will continue to diligently monitor and navigate delays, as more are sure to reveal themselves over the coming few weeks that may affect your home’s completion schedule, and you can look forward to hearing from me on anything that may affect your projected completion time. In anticipation of that, I ask that you remain flexible should the schedule need to adjust, as there are simply many facets of this process and these conditions that are changing on a daily basis.

    In the meantime, I ask that you continue to work on your end on matters related to your financing in preparation for closing. Please keep me apprised of anything on your end that may have any effect on moving towards closing.

    In closing, I pray you and your family and friends remain healthy and optimistic, knowing that we will prevail through this unprecedented challenge.

    Faithfully,
    | jC

    (Cross-posted to all clients via Clickbuild.io)
  • Scheduled by Jeff  |  Mar 19, 2020 - 1:04pm

    Preliminary Detail Clean

  • Scheduled by Jeff  |  Mar 19, 2020 - 1:03pm

    Final Site Debris Clean-Up

  • Scheduled by Jeff  |  Mar 19, 2020 - 1:03pm

    Garage Door Opener Installation

  • Scheduled by Jeff  |  Mar 19, 2020 - 1:02pm

    Cabinet Final & Adjustments

  • Scheduled by Jeff  |  Mar 19, 2020 - 1:02pm

    Fireplace Final Installation

  • Scheduled by Jeff  |  Mar 19, 2020 - 1:01pm

    Security, Media, & Tech Final

  • Scheduled by Jeff  |  Mar 19, 2020 - 1:01pm

    Window Screen Installation

  • Marked as complete by Jeff  |  Mar 19, 2020 - 1:01pm

    Barn Door(s) Installation

  • Marked as complete by Jeff  |  Mar 19, 2020 - 1:00pm

    Hardwood Flooring Installation

  • Marked as complete by Jeff  |  Mar 19, 2020 - 1:00pm

    Heat, Ventilation, & Air Conditioning Final Installation

  • Marked as complete by Jeff  |  Mar 19, 2020 - 1:00pm

    Concrete Counter Top Installation

  • Marked as complete by Jeff  |  Mar 19, 2020 - 12:59pm

    Post-Installation Sod Manual Watering Scheduled

  • Marked as complete by Jeff  |  Mar 19, 2020 - 12:59pm

    Termite Certificate & Guarantee Received & Filed

  • Marked as complete by Jeff  |  Mar 19, 2020 - 12:59pm

    Mirror & Glass Templated

  • Phase Completed!  |  Mar 19, 2020 - 12:59pm

    Insulation To Trim

  • Scheduled by Jeff  |  Mar 19, 2020 - 10:45am

    Appliance Package Delivery

  • Scheduled by Jeff  |  Mar 17, 2020 - 2:58pm

    Lighting Fixture Package Delivery

  • Scheduled by Jeff  |  Mar 17, 2020 - 2:57pm

    Electrical & Lighting Final Installation

  • Scheduled by Jeff  |  Mar 17, 2020 - 12:58pm

    Attic Insulation Installation

  • Scheduled by Jeff  |  Mar 17, 2020 - 12:55pm

    Carpet Installation Scheduled

  • Scheduled by Jeff  |  Mar 17, 2020 - 12:55pm

    Hardware Installation

  • Marked as complete by Jeff  |  Mar 17, 2020 - 12:54pm

    Natural Gas Connections Completed & JCH-Verified

  • Marked as complete by Jeff  |  Mar 17, 2020 - 12:53pm

    Backsplash & Remaining Wall Tile Installation

  • Marked as complete by Jeff  |  Mar 17, 2020 - 12:13pm

    Cabs Pre-Drilled for Hardware

  • Marked as complete by Jeff  |  Mar 17, 2020 - 12:13pm

    Adjacent Lot Dirt & Debris Removed

  • Marked as complete by Jeff  |  Mar 17, 2020 - 12:12pm

    Exterior Door Painting

  • Marked as complete by Jeff  |  Mar 17, 2020 - 12:12pm

    Irrigation System Programming & Activation (or N/A)

  • Marked as complete by Jeff  |  Mar 17, 2020 - 12:12pm

    Sod Installation

  • Marked as complete by Jeff  |  Mar 17, 2020 - 12:12pm

    Preliminary Tile Flooring Completion

  • Marked as complete by Jeff  |  Mar 17, 2020 - 11:09am

    Preliminary Wall Tile Completion

  • Marked as complete by Jeff  |  Mar 9, 2020 - 9:42am

    Irrigation System Installation (or N/A)

  • Marked as complete by Jeff  |  Mar 6, 2020 - 10:23am

    Interior Stain & Painting

  • Marked as complete by Jeff  |  Mar 6, 2020 - 10:23am

    Barn Door Installation Scheduled

  • Marked as complete by Jeff  |  Mar 6, 2020 - 10:23am

    Solid Surface Counter Top Templating

  • Marked as complete by Jeff  |  Mar 6, 2020 - 10:23am

    Wall Tile Details Notated On Walls

  • Marked as complete by Jeff  |  Mar 6, 2020 - 10:23am

    Landscape Bed Installation

  • Marked as complete by Jeff  |  Mar 6, 2020 - 10:20am

    Laminate Counter Top Installation

  • Marked as complete by Jeff  |  Mar 6, 2020 - 10:20am

    Solid Surface Counter Top Installation

  • Marked as complete by Jeff  |  Mar 6, 2020 - 10:20am

    Laminate Counter Top Templating

  • Marked as complete by Jeff  |  Mar 4, 2020 - 3:29pm

    Final Site Grade

  • Scheduled by Jeff  |  Mar 3, 2020 - 11:46am

    Irrigation System Installation (or N/A)

  • Scheduled by Jeff  |  Mar 3, 2020 - 11:44am

    Landscape Bed Installation

  • Scheduled by Jeff  |  Mar 3, 2020 - 11:43am

    Final Site Grade

  • Marked as complete by Jeff  |  Mar 3, 2020 - 11:42am

    Exterior Wood Column Installation

  • Marked as complete by Jeff  |  Mar 3, 2020 - 11:42am

    2nd Phase Concrete Flooring Scheduled

  • Scheduled by Jeff  |  Feb 27, 2020 - 10:22am

    Lighting Selections Scheduled

  • Scheduled by Jeff  |  Feb 27, 2020 - 10:20am

    Laminate Counter Top Templating

  • Marked as complete by Jeff  |  Feb 26, 2020 - 3:22pm

    Flatwork Form Removal

  • Marked as complete by Jeff  |  Feb 26, 2020 - 3:22pm

    ROWS Inspection Passed & JCH Verified

  • Marked as complete by Jeff  |  Feb 26, 2020 - 3:22pm

    ROWS Inspection Requested & JCH-Verified

  • Scheduled by Jeff  |  Feb 24, 2020 - 4:23pm

    Preliminary Wall Tile Completion

  • Marked as complete by Jeff  |  Feb 24, 2020 - 4:10pm

    Preliminary Floor &/or Wall Tile Scheduled

  • Scheduled by Jeff  |  Feb 24, 2020 - 1:26pm

    Plumbing Final Installation

  • Scheduled by Jeff  |  Feb 21, 2020 - 3:31pm

    Barn Door Installation Scheduled

  • Marked as complete by Jeff  |  Feb 21, 2020 - 3:13pm

    Pre-Flatwork Conduit Sleeving

  • Scheduled by Jeff  |  Feb 21, 2020 - 3:13pm

    Solid Surface Counter Top Installation

  • Scheduled by Jeff  |  Feb 21, 2020 - 3:13pm

    Laminate Counter Top Installation

  • Scheduled by Jeff  |  Feb 21, 2020 - 3:12pm

    Concrete Counter Top Installation

  • Marked as complete by Jeff  |  Feb 21, 2020 - 3:11pm

    Concrete Counter Top Templating

  • Marked as complete by Jeff  |  Feb 21, 2020 - 3:07pm

    Hardscape Design Notes Complete & Posted to CB

  • Phase Completed!  |  Feb 21, 2020 - 3:07pm

    Exterior Rough

  • Marked as complete by Jeff  |  Feb 21, 2020 - 3:07pm

    Electrical Final Meter & Service Installed

  • Marked as complete by Jeff  |  Feb 21, 2020 - 3:07pm

    Electrical Final Meter & Service Installation Scheduled

  • Marked as complete by Jeff  |  Feb 21, 2020 - 3:07pm

    Phase 2 Design Session Completed

  • Marked as complete by Jeff  |  Feb 21, 2020 - 3:07pm

    Phase 2 Design Session Notes Reviewed & Posted to Clickbuild

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:19am

    Trim Sweep & Haul Complete

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:19am

    Final Exterior Door Installed

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:19am

    Trim Back-Out & Detail

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:19am

    Curb & Form Haul

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:19am

    Flatwork Relief Cuts & Caulking

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:19am

    Flatwork Pour

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:19am

    Driveway Approach & CIty-Walk Inspection

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:18am

    Flatwork Sand Ordered

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:18am

    Exterior Door Installation Scheduled

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:18am

    Masonry Site-Haul Completion

  • Marked as complete by Jeff  |  Feb 3, 2020 - 10:18am

    Exterior Brick Masonry Completion

  • Posted by Jeff Click  |  Jan 31, 2020 - 3:03pm
    SOLD!
    Future Home of Phillip & Alexa Bostick

    Phillip & Alexa, congratulations on making this home yours! I'm so grateful for the opportunity to collaborate with you both to fulfill the vision of making this another amazing home. I'm looking forward to working with you. Have a great weekend! | jC
  • Scheduled by Jeff  |  Jan 28, 2020 - 8:18am

    Surplus Trim Pick-Up

  • Marked as complete by Jeff  |  Jan 20, 2020 - 8:54am

    Relocate Irrigation Loop Stubout

  • Scheduled by Jeff  |  Jan 6, 2020 - 3:40pm

    Relocate Irrigation Loop Stubout

  • New task added by Jeff  |  Jan 6, 2020 - 3:40pm

    Relocate Irrigation Loop Stubout

  • Marked as complete by Jeff  |  Jan 6, 2020 - 1:07pm

    Flatwork Form Setup

  • Marked as complete by Jeff  |  Dec 30, 2019 - 10:28am

    Natural Gas Meter Installation Scheduled

  • Marked as complete by Jeff  |  Dec 30, 2019 - 10:28am

    Natural Gas Line Installed

  • Marked as complete by Jeff  |  Dec 26, 2019 - 2:29pm

    Flatwork Sand On Site

  • Scheduled by Jeff  |  Dec 16, 2019 - 4:21pm

    Flatwork Sand On Site

  • Scheduled by Jeff  |  Dec 11, 2019 - 4:55pm

    Flatwork Form Setup

  • Marked as complete by Jeff  |  Dec 11, 2019 - 4:54pm

    Trim Sweep & Haul Scheduled

  • Marked as complete by Jeff  |  Dec 11, 2019 - 4:54pm

    Builder Trim, Paint, & Detail Walk-Through

  • Marked as complete by Jeff  |  Dec 11, 2019 - 4:54pm

    Interior Masonry Completion

  • Marked as complete by Jeff  |  Dec 11, 2019 - 4:53pm

    Interior Masonry Scheduled (Or N/A)

  • Marked as complete by Jeff  |  Dec 11, 2019 - 4:53pm

    Hardscape/Flatwork Contractor Scheduled

  • Marked as complete by Jeff  |  Dec 11, 2019 - 4:53pm

    Post-Masonry Roof Flashing & Metal Capping Completion (Or N/A)

  • Marked as complete by Jeff  |  Dec 11, 2019 - 4:53pm

    Masonry Site-Haul Scheduled

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:36am

    Trim Carpenter On Site - Door & Backout

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:36am

    Cabinet Delivery & Installation

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:36am

    Interior Trim & Doors On Site

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Insulation Inspection Passed

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Drywall Phase Site Clean-Up

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Post Drywall Floor-Cleaning Completion

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Temporary Exterior Door Hardware Installation

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Attic Access Installation Completion

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Concrete Flooring Work Complete

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Insulation & Sealant Installation Completion

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Interior Trim & Door Delivery Scheduled

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Post Drywall Floor-Cleaning Scheduled

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Drywall Phase Site Clean-Up Scheduled

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Cabinet Delivery & Installation Scheduled

  • Marked as complete by Jeff  |  Nov 25, 2019 - 9:35am

    Temporary Construction Heat Coordinated

  • Marked as complete by Jeff  |  Nov 14, 2019 - 11:28am

    Phase 2 Design Session Scheduled

  • Phase Completed!  |  Nov 14, 2019 - 11:28am

    Frame To Inspections

  • Marked as complete by Jeff  |  Nov 14, 2019 - 11:28am

    Trim & Interior Door Material Take-Off & Ordered

  • Scheduled by Jeff  |  Nov 14, 2019 - 10:06am

    Interior Trim & Doors On Site

  • Marked as complete by Jeff  |  Nov 14, 2019 - 9:14am

    Masonry Sand On Site

  • Marked as complete by Jeff  |  Nov 14, 2019 - 9:14am

    Brick On Site

  • Scheduled by Jeff  |  Nov 13, 2019 - 9:40am

    Cabinet Delivery & Installation

  • Marked as complete by Jeff  |  Nov 12, 2019 - 1:40pm

    Drywall Tape, Bed, & Texture Completion

  • Marked as complete by Jeff  |  Nov 11, 2019 - 8:55am

    Garage Door Installation

  • Marked as complete by Jeff  |  Nov 11, 2019 - 8:55am

    Supplemental Masonry Material On Site

  • Marked as complete by Jeff  |  Nov 11, 2019 - 8:55am

    Sheetrock Installation Completion

  • Posted by Jeff Click  |  Nov 8, 2019 - 9:41am
    Black Friday Sale
    Black Friday For Your House & Family Vacation
    I wanted to bring this opportunity to your attention, as my appliance supplier (Known both as Hahn Appliances *and* Metro Appliances & More...same company) is having a 10% clearance on 11/14. This could be a good opportunity to grab a nice refrigerator, washer & dryer, or anything else you have on your wish list for the new pad.

    If you don't take advantage of this sale, remember I can always get you my wholesale pricing on those items at any other time, which would include delivery and installation. Feel free to hit me up with any model numbers of items you'd like quotes on.

    Also, I wanted to let you know in advance that I will be out for the week of the 18th-22nd for an overdue family getaway. I always leave with appropriate project progress scheduled to take place where possible, and I do have assistance in getting eyes on the jobs on site. I can also check-in via my remote site cameras to monitor progress. Note that I do build in cushion into construction schedules to allow a margin for things like this, weather, and holidays. Nonetheless, I wanted to make you aware of it in case you reached out to me and didn't hear back in my usual response window.

    Have a great weekend!

    | jC
  • Scheduled by Jeff  |  Nov 5, 2019 - 12:30pm

    Brick On Site

  • Scheduled by Jeff  |  Nov 5, 2019 - 12:29pm

    Supplemental Masonry Material On Site

  • Scheduled by Jeff  |  Nov 5, 2019 - 12:25pm

    Masonry Sand On Site

  • Marked as complete by Jeff  |  Nov 5, 2019 - 12:22pm

    Masonry Sand Ordered

  • Marked as complete by Jeff  |  Nov 5, 2019 - 12:22pm

    Supplemental Masonry Material Ordered

  • Marked as complete by Jeff  |  Nov 5, 2019 - 12:22pm

    Exterior Masonry Scheduled

  • Marked as complete by Jeff  |  Nov 5, 2019 - 12:22pm

    Insulation Inspection Requested & Confirmed by Jeff

  • Marked as complete by Jeff  |  Nov 5, 2019 - 12:21pm

    Exterior Facade Materials Ordered

  • Marked as complete by Jeff  |  Nov 5, 2019 - 12:21pm

    Framing | Accent Panelling Installation

  • Marked as complete by Jeff  |  Nov 4, 2019 - 3:10pm

    Drywall Material On Site

  • Marked as complete by Jeff  |  Nov 4, 2019 - 10:45am

    Wall Insulation Installation

  • Marked as complete by Jeff  |  Oct 30, 2019 - 3:01pm

    Water Meter Installed & Back-filled

  • Marked as complete by Jeff  |  Oct 30, 2019 - 3:01pm

    Post-Design Session Pricing Audit

  • Marked as complete by Jeff  |  Oct 30, 2019 - 3:01pm

    Phase 1 Design Session Notes Reviewed & Posted to Clickbuild

  • Phase Completed!  |  Oct 30, 2019 - 3:01pm

    Pad To Foundation

  • Marked as complete by Jeff  |  Oct 30, 2019 - 3:01pm

    Phase 1 Design Session Completed

  • Scheduled by Jeff  |  Oct 30, 2019 - 2:59pm

    Sheetrock Installation Completion

  • Scheduled by Jeff  |  Oct 30, 2019 - 2:58pm

    Garage Door Installation

  • Scheduled by Jeff  |  Oct 30, 2019 - 2:58pm

    Wall Insulation Installation

  • Marked as complete by Jeff  |  Oct 30, 2019 - 2:55pm

    Attic Access Installation Scheduled

  • Marked as complete by Jeff  |  Oct 30, 2019 - 2:55pm

    Garage Door Installation Scheduled

  • Marked as complete by Jeff  |  Oct 30, 2019 - 2:55pm

    Wall Insulation & Seal Package Scheduled

  • Marked as complete by Jeff  |  Oct 30, 2019 - 2:55pm

    Lighting Selections Scheduled

  • Scheduled by Jeff  |  Oct 30, 2019 - 2:54pm

    Wall Insulation & Seal Package Scheduled

  • Marked as complete by Jeff  |  Oct 30, 2019 - 2:14pm

    Drywall Contractor Scheduled

  • Marked as complete by Jeff  |  Oct 30, 2019 - 2:14pm

    Framer Punch-List Completion

  • Marked as complete by Jeff  |  Oct 30, 2019 - 2:14pm

    Sheetrock & Materials Order Scheduled For Delivery

  • Marked as complete by Jeff  |  Oct 30, 2019 - 2:14pm

    Building Rough-In Inspection Passed

  • Scheduled by Jeff  |  Oct 29, 2019 - 11:38am

    Drywall Material On Site

  • Marked as complete by Jeff  |  Oct 29, 2019 - 11:38am

    Final Exterior Door Ordered

  • Marked as complete by Jeff  |  Oct 29, 2019 - 11:34am

    Natural Gas Line Installation Scheduled

  • Marked as complete by Jeff  |  Oct 29, 2019 - 11:34am

    Cabinet Take-Off & Design Review

  • Marked as complete by Jeff  |  Oct 29, 2019 - 11:34am

    Post-Tension Cables Stressed & Secured

  • Scheduled by Jeff  |  Oct 29, 2019 - 11:33am

    Natural Gas Line Installed

  • Marked as complete by Jeff  |  Oct 24, 2019 - 12:46pm

    Building Rough-In Inspection Requested

  • Marked as complete by Jeff  |  Oct 24, 2019 - 12:46pm

    HVAC Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Oct 24, 2019 - 12:46pm

    Drywall Take-off Requested

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:34pm

    Silt-Fencing & Storm-Water Run-Off Protection Verified

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:34pm

    Surplus Lumber Pickup

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:34pm

    Frame Debris Site-Haul & Interior Sweep Completion

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:34pm

    Temporary Exterior Door Installation

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:33pm

    Fireplace Gas Connections Complete & Verified

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:31pm

    HVAC Rough-In Inspection Contractor-Requested & JCH-Verified

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:31pm

    Natural Gas System Analysis Requested

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:31pm

    Plumbing Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:31pm

    Plumbing Rough Inspection Contractor-Requested & JCH-Verified

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:31pm

    Electric Meter Installation Scheduled

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:31pm

    Electrical Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:31pm

    Electrical Rough-In Inspection Requested & JCH Verified

  • Marked as complete by Jeff  |  Oct 23, 2019 - 4:30pm

    Builder's Framing & Rough-In Review & Notation

  • Marked as complete by Jeff  |  Oct 18, 2019 - 11:03am

    Electrical Rough-In Completion

  • Marked as complete by Jeff  |  Oct 18, 2019 - 11:03am

    Fireplace Installation

  • Marked as complete by Jeff  |  Oct 16, 2019 - 12:42pm

    Tech & Security Rough-In Completion

  • Scheduled by Jeff  |  Oct 11, 2019 - 2:49pm

    Tech & Security Rough-In Completion

  • Marked as complete by Jeff  |  Oct 11, 2019 - 2:48pm

    Plumbing Rough-In Completion

  • Marked as complete by Jeff  |  Oct 11, 2019 - 2:48pm

    HVAC Rough-In Completion

  • Marked as complete by Jeff  |  Oct 11, 2019 - 2:48pm

    Window & Exterior Door Installation Completion

  • Marked as complete by Jeff  |  Oct 11, 2019 - 2:48pm

    Tech & Security Rough-In Scheduled

  • Marked as complete by Jeff  |  Oct 11, 2019 - 2:48pm

    Fireplace Installation Scheduled

  • Marked as complete by Jeff  |  Oct 10, 2019 - 4:49pm

    Frame Debris Site-Haul & Interior Sweep Scheduled

  • Marked as complete by Jeff  |  Oct 10, 2019 - 4:49pm

    Exterior Moisture Barrier Inspection Passed

  • Marked as complete by Jeff  |  Oct 10, 2019 - 4:49pm

    Exterior Wall Sheathing Inspection Passed

  • Marked as complete by Jeff  |  Oct 10, 2019 - 4:49pm

    Window & Exterior Door Installation Scheduled

  • Marked as complete by Jeff  |  Oct 10, 2019 - 4:49pm

    Framing | Cornice & Detail Phase Completion

  • Marked as complete by Jeff  |  Oct 10, 2019 - 4:49pm

    Framing | Rafter & Decking Phase Completion

  • Marked as complete by Jeff  |  Oct 9, 2019 - 7:13pm

    Roof Installation

  • Scheduled by Jeff  |  Oct 1, 2019 - 12:50pm

    Electrical Rough-In Completion

  • Scheduled by Jeff  |  Oct 1, 2019 - 12:47pm

    Plumbing Rough-In Completion

  • Scheduled by Jeff  |  Oct 1, 2019 - 12:45pm

    HVAC Rough-In Completion

  • Scheduled by Jeff  |  Oct 1, 2019 - 12:43pm

    Fireplace Installation

  • Scheduled by Jeff  |  Oct 1, 2019 - 12:42pm

    Window & Exterior Door Installation Completion

  • Scheduled by Jeff  |  Oct 1, 2019 - 12:41pm

    Roof Installation

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Exterior Moisture Barrier Inspection Requested (Or N/A)

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Exterior Wall Sheathing Inspection Requested

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Electrical Rough-In Scheduled

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    HVAC Rough-In Scheduled

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Plumbing Rough-In Scheduled

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Roofing Material & Labor Scheduled

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Framing | Joist Phase Completion

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Framing | Wall & Sheathing Phase Completion

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Preliminary Wall Layout / Frame Started

  • Marked as complete by Jeff  |  Oct 1, 2019 - 12:40pm

    Framing Lumber | Decking & Cornice Order

  • Marked as complete by Jeff  |  Sep 18, 2019 - 11:09am

    Framing Lumber | Joist & Rafter Order

  • Marked as complete by Jeff  |  Sep 18, 2019 - 11:09am

    Framing Lumber | Wall Pack Order

  • Marked as complete by Jeff  |  Sep 18, 2019 - 11:09am

    Framing Plans Distributed to Framing Contractor

  • Marked as complete by Jeff  |  Aug 27, 2019 - 12:15pm

    2nd Part Permit Obtained (Or N/A)

  • Marked as complete by Jeff  |  Aug 27, 2019 - 12:15pm

    Foundation Form Removal

  • Marked as complete by Jeff  |  Aug 27, 2019 - 12:15pm

    Future Storm Shelter Location Poured/Not Poured Per Specifications

  • Marked as complete by Jeff  |  Aug 27, 2019 - 12:15pm

    Foundation Poured

  • Marked as complete by Jeff  |  Aug 27, 2019 - 12:15pm

    Dropped Shower Floor(s) Formed & Verified

  • Marked as complete by Jeff  |  Aug 27, 2019 - 12:15pm

    Future Storm Shelter Location Formed & Verified

  • Marked as complete by Jeff  |  Aug 20, 2019 - 3:50pm

    Framing Wall-Pack Delivery Scheduled

  • Marked as complete by Jeff  |  Aug 20, 2019 - 3:50pm

    Concrete Flooring Work Scheduled

  • Marked as complete by Jeff  |  Aug 20, 2019 - 6:58am

    3rd Party Engineering Inspection

  • Marked as complete by Jeff  |  Aug 20, 2019 - 6:58am

    Sewer Installed, Tapped, & Back-filled

  • Marked as complete by Jeff  |  Aug 20, 2019 - 6:58am

    Termite Pre-Treatment For Foundation

  • Marked as complete by Jeff  |  Aug 20, 2019 - 6:58am

    Post-Tension Foundation Cables Set

  • Posted by Jeff Click  |  Aug 20, 2019 - 6:58am
    Your Design Notes
    It's Time To Design!
    We're at the point when it's time to start thinking in greater detail about your new home! Design Session 1 is upon us, which involves exterior finish selections, electrical and tech layout, flooring diagram, and more preliminary design decisions. Don't sweat these decisions! I'm here to guide you through making fantastic choices.

    Design sessions need to be scheduled during business hours, as often we need to walk a few doors down to look at materials from suppliers, or make phone calls to check on availability that other decisions depend on. DS1 can often be fully completed over a lunch hour meeting if that helps fit into your schedule better (it usually takes 1-2 hours, max).

    What are some days and times in the next 2 weeks that you have available? I'm looking forward to our next time together!

    | jC
  • Marked as complete by Jeff  |  Aug 20, 2019 - 6:58am

    DS1 Scheduled

  • Phase Completed!  |  Aug 20, 2019 - 6:58am

    Start To Permit

  • Marked as complete by Jeff  |  Aug 19, 2019 - 1:01pm

    Ground Electrical Installed

  • Marked as complete by Jeff  |  Aug 19, 2019 - 1:01pm

    Ground Electrical Installed

  • Scheduled by Jeff  |  Aug 12, 2019 - 10:48am

    Ground Electrical Installed

  • Marked as complete by Jeff  |  Aug 12, 2019 - 10:47am

    Ground Plumbing Inspection Passed

  • Marked as complete by Jeff  |  Aug 12, 2019 - 10:47am

    Ground Plumbing Installed

  • Marked as complete by Jeff  |  Aug 12, 2019 - 10:47am

    Load of Sand For Plumbers Ordered

  • Marked as complete by Jeff  |  Aug 12, 2019 - 10:47am

    Award Of Project To Trades & Contractors

  • Marked as complete by Jeff  |  Aug 5, 2019 - 10:38am

    Foundation Forms Constructed

  • Marked as complete by Jeff  |  Aug 5, 2019 - 10:38am

    Porta-Potty Delivered

  • Marked as complete by Jeff  |  Aug 5, 2019 - 10:38am

    Site Identification Sign Installed

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:55am

    Issuance Of Building Permit

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:55am

    Trash Bin Materials Ordered

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:55am

    Site Drainage Analysis & Plan

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:54am

    Final Design Notes Created

  • Posted by Jeff Click  |  Jul 31, 2019 - 6:54am
    It's about to become official.
    The application for permit, along with printed plans, have been submitted to the governing municipality for review. This usually takes between a few days to a week. Once approved, we are ready for construction on site! While the review is taking place, I am getting your project "in the queue" with my contractors and suppliers to ensure that everything is in order once the permit has been approved.

    Stand by for some fun visual progress on site in the coming days!

    -JC
  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:54am

    Plans & Application Submitted for Permits

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:54am

    Window Take-Off & Bid Received

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:54am

    Foundation Engineering Printed & Ready For Distribution

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:54am

    Foundation Engineering JCH-Verified

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:54am

    Framing Engineering & Material Take-Off Received

  • Marked as complete by Jeff  |  Jul 25, 2019 - 6:59am

    Trash Bin Constructed

  • Marked as complete by Jeff  |  Jul 23, 2019 - 6:44am

    Pad Site Grading

  • Marked as complete by Jeff  |  Jul 18, 2019 - 6:47am

    Foundation Engineering Complete

  • Scheduled by Jeff  |  Jul 17, 2019 - 6:34am

    Ground Plumbing Installed

  • Scheduled by Jeff  |  Jul 17, 2019 - 6:33am

    Trash Bin Constructed

  • Scheduled by Jeff  |  Jul 17, 2019 - 6:32am

    Pad Site Grading

  • Marked as complete by Jeff  |  Jul 17, 2019 - 6:31am

    Temp Electric Pole Installed

  • Marked as complete by Jeff  |  Jul 17, 2019 - 6:31am

    Foundation Plans Distributed To Plumbing & Foundation Contractors

  • Marked as complete by Jeff  |  Jul 11, 2019 - 11:23am

    Window Take-Off & Bid Requested

  • Scheduled by Jeff  |  Jul 11, 2019 - 10:23am

    Foundation Engineering Complete

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Closing of Lot & Construction Financing Secured

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Property Pins Located On Site

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Permit-Ready Plans Printed For Permitting

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Framing Engineering & Material Take-Off Requested

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Foundation Engineering Ordered

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Final Project Data Updated in CB

  • Posted by Jeff Click  |  Jul 11, 2019 - 10:21am
    Check, Check, Build!
    The Plans Are Now Official
    Good news! The revised set of plans have been returned by the CAD Draftsman. I have personally cross-checked the new set of plans with our notes from the Plan Review Meeting Check-List, and all of our discussed modifications have been made to satisfaction.

    This means that the plans are now considered "official", and final. These plans are now passed on for foundation engineering, lumber/structural engineering, and window ordering.

    Lots of site progress to follow!

    | jC
  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Final Plan Revisions JCH-Verified

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Final Plan Revisions Received

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Pricing Updated From Pre-Con

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Final Plan Revisions Submitted To Draftsman

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:21am

    Final Pre-Con Redline Notes

  • Marked as complete by Jeff  |  Jul 8, 2019 - 2:19pm

    Pre-Con Plan Review with Client

  • Marked as complete by Jeff  |  Jul 8, 2019 - 2:19pm

    Jeff's Plan Review & Pre-Con Comments

  • Marked as complete by Jeff  |  Jul 8, 2019 - 2:19pm

    Pre-con Meeting Packet Created

  • Marked as complete by Jeff  |  Jul 8, 2019 - 2:19pm

    Client Pre-Con Scheduled

  • Marked as complete by Jeff  |  Jul 8, 2019 - 2:19pm

    Draft of Plans Sent To Bank for Pre-Appraisal (or N/A)

  • Marked as complete by Jeff  |  Jun 12, 2019 - 8:25am

    Initial Draft of Plans Received

  • Marked as complete by Jeff  |  Jun 12, 2019 - 8:25am

    Plan Redline Submitted To Draftsman

  • Marked as complete by Jeff  |  Jun 12, 2019 - 8:25am

    Construction Financing Budget Submitted to Bank

  • Marked as complete by Jeff  |  Jun 12, 2019 - 8:25am

    Lot Closing Scheduled

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Plumbing Final Inspection Requested & JCH-Confirmed