Progress feed:
1716 NE 16th
← Back to Home Details
  • Marked as complete by Jeff  |  Mar 3, 2020 - 7:44pm

    Address 3 Defective Drawers

  • New task added by Jeff  |  Feb 10, 2020 - 8:51am

    Address 3 Defective Drawers

  • Posted by Jeff Click  |  Nov 11, 2019 - 8:59am
    This week's forecast as of Monday morning.
    Winter Advisory
    With this week's incoming weather, I'd like to offer some advice on how best to prepare and protect your home from its effects. These are simple but important tasks to perform to prevent inconveniences and potential harm that extreme temperatures can bring to homes, including new ones.

    1) Disconnect all exterior hoses from the faucets. Your exterior faucets (called hose bibs) are designed to withstand the elements of harsh weather. However, having a hose connected dramatically increases the potential for water within the hose to freeze and expand into the inner portions of the hose bib, potentially rupturing its supply pipe. Simply disconnecting the hose is the best way to prevent this.

    2) Close that garage door. During nicer weather, it's not unusual for some to be in the habit of leaving the overhead door up for a bit into the evening. However, during extremely colder temperatures, doing so will increase the load on your home's energy performance, causing your HVAC system to have to work harder to keep your home comfortable. You also risk forgetting to close the door overnight, which exposes the plumbing to and from your hot water closet to potential freezing and rupturing.

    3) Test that heat & fireplace. When going into Fall, it's always a good idea to test your heater(s) and fireplace before you actually need them. That way if something isn't working properly it can be addressed before it beomes an urgent need. Run your heater(s) for a few minutes to ensure they are emitting warm air, and don't be alarmed if you smell a hint of a burning smell. This is simply the result of burning off dust on the coils that haven't been hot for a while.

    4) Replace those filters. When your heater can breath better, it heats better. If you haven't changed your air filters at the returns in the past 30 days, you definitely want to do that to help make way for maximum airflow and energy performance (which results in greater comfort.). Remember, don't buy the expensive ones. Get mid-level ones from Lowe's and change them often (every 30 days is the best practice).

    5) Be aware of plumbing on exterior walls. If you have any bathroom sinks or shower/tub faucets that are on exterior walls, there are a couple of techniques you'll want to be aware of when temps are expected to dip into the teens or below. For any bathroom sinks on exterior walls, leave the cabinet doors open that are underneath the sink to provide better warm air to circulate. For both sinks and tubs/showers on exterior walls, it may also be necessary to turn on the faucets to a slow drip during extreme temperatures, as moving water helps prevent freezing.

    6) Turn off your yard's irrigation system if you have one. This is easy to do, and involves two steps: 1) Turn your controller to off. Your controller is mounted on the inside wall of your garage. In most models, this is simply a dial that you turn to the "Off" position. Turning off prevents the controller from telling your solenoid valves to turn on/off unnecessarily. This is known as dry-firing since it's turning the valves on when water isn't present. 2) Turn off the water supply to the system by turning off a valve at your backflow preventer, which is usually inside your hot water tank closet. You have two valves similar to the blue levers shown below, and turning one of them perpendicular to the pipe will turn off the water supply to the system. (Reverse this process in the spring, or any time temperatures get back into the range of needing to water your landscape.)

    A typical bakcflow preventer, located within your hot water closet.


    Accomplishing these simple tasks will go a long way towards making wintery weather more bearable. Don't forget to start the coffee maker! | jC
  • Marked as complete by Jeff  |  Oct 9, 2019 - 10:10am

    Master Bathroom Drawer Won't Stay Closed

  • Marked as complete by Jeff  |  Sep 5, 2019 - 10:04am

    Patio Screen Door Won't Stay On Tracks

  • Marked as complete by Jeff  |  Sep 3, 2019 - 4:24pm

    Garage Door Opener Not Operating

  • Marked as complete by Jeff  |  Sep 3, 2019 - 3:42pm

    Garage Door Opener Not Operating

  • New task added by Jeff  |  Aug 29, 2019 - 7:48pm

    Garage Door Opener Not Operating

  • Marked as complete by Jeff  |  Aug 13, 2019 - 11:55am

    Master Bathroom Drawer Won't Stay Closed

  • New task added by Jeff  |  Jul 22, 2019 - 9:36am

    Master Bathroom Drawer Won't Stay Closed

  • Marked as complete by Jeff  |  Jul 16, 2019 - 8:58am

    Check Vent Boot for Kitchen Vent

  • Marked as complete by Jeff  |  Jul 11, 2019 - 11:40am

    Breaker Continually Trips

  • New task added by Jeff  |  Jul 3, 2019 - 12:07pm

    Obtain Termite Certificates A & B

  • New task added by Jeff  |  Jun 21, 2019 - 10:55am

    Breaker Continually Trips

  • Marked as complete by Jeff  |  Jun 19, 2019 - 6:38am

    Replace (3) Indian Hawthornes in Front Bed

  • New task added by Jeff  |  Jun 12, 2019 - 6:14am

    Patio Screen Door Won't Stay On Tracks

  • New task added by Jeff  |  Jun 12, 2019 - 6:13am

    Check Vent Boot for Kitchen Vent

  • Marked as complete by Jeff  |  Jun 12, 2019 - 6:12am

    Pre-Closing Walk-Through Punch Items Completed

  • Marked as complete by Jeff  |  Jun 12, 2019 - 6:12am

    email debugging task

  • New task added by Jeff  |  Jun 10, 2019 - 9:23am

    Replace (3) Indian Hawthornes in Front Bed

  • Marked as complete by Jeff  |  Jun 10, 2019 - 9:22am

    Remaining Pre-Closing Walkthrough Items Assigned In Warranty Phase

  • Phase Completed!  |  Jun 10, 2019 - 9:22am

    Punch To Closed

  • Marked as complete by Jeff  |  Jun 10, 2019 - 9:22am

    Closing-Day Final Paint Touch-Up

  • Marked as complete by Jeff  |  Jun 10, 2019 - 9:22am

    Closing Day Pre-Closing Orientation With Client

  • Marked as complete by Jeff  |  Jun 10, 2019 - 6:52am

    Final-Final Clean

  • Marked as complete by Jeff  |  May 21, 2019 - 6:21am

    Address Panel Installed

  • Phase Completed!  |  May 21, 2019 - 6:21am

    Exterior Detail

  • Marked as complete by Jeff  |  May 20, 2019 - 5:53am

    Hall & Master Showers Still Need Grout Caulking

  • Marked as complete by Jeff  |  May 20, 2019 - 5:49am

    Fence Installation

  • Scheduled by Jeff  |  May 14, 2019 - 2:45pm

    Final-Final Clean

  • Scheduled by Jeff  |  May 10, 2019 - 6:37am

    Fence Installation

  • Scheduled by Jeff  |  May 10, 2019 - 6:20am

    Hall & Master Showers Still Need Grout Caulking

  • New task added by Jeff  |  May 10, 2019 - 6:19am

    Hall & Master Showers Still Need Grout Caulking

  • Scheduled by Jeff  |  May 1, 2019 - 6:06am

    Appliance Package Delivery

  • New task added by Jeff  |  Apr 18, 2019 - 10:58am

    Fence Installation

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Flowerbed Debris & Weed Removal & Mulch Refreshment

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Debris & Materials Removed & Dirt Smoothed On Any Adjacent Property

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Storm Shelter Cleaned & Secured

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Garage Baseboards, Doors, & Casings Wiped Down Post-Power Wash

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Surplus Tile Materials Gathered & Stored For Future Use

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Paint Touch Up Kit Created & Neatly Stored In Utility Room

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Misc. Punch Items Needing Addressed

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Paint Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Drywall Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Tech & Media Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    HVAC Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Window & Exterior Door Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Glass & Mirror Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Cosmetic Surface Repair Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Laminate Counter Top Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Solid Surface Counter Top Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Masonry Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Flooring Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Electrical Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Plumbing Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Cabinetry Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Trim & Hardware Punch List

  • Marked as complete by Jeff  |  Mar 30, 2019 - 1:53pm

    Surplus Trim Material Pick-Up

  • Marked as complete by Jeff  |  Mar 26, 2019 - 6:32am

    Garage, Drive, & Flatwork Power-Washing

  • Marked as complete by Jeff  |  Mar 26, 2019 - 6:32am

    Stained Concrete Final

  • Marked as complete by Jeff  |  Mar 26, 2019 - 6:32am

    Carpet Installation

  • Marked as complete by Jeff  |  Mar 26, 2019 - 6:32am

    Certificate of Occupancy Issued

  • Marked as complete by Jeff  |  Mar 26, 2019 - 6:32am

    Electrical Final Inspection

  • Marked as complete by Jeff  |  Mar 20, 2019 - 6:29am

    Punch Lists Entered in CB & Transmitted To Respective Contractors

  • Marked as complete by Jeff  |  Mar 20, 2019 - 6:29am

    Exterior Door Weather Stripping & Threshold Adjustment

  • Marked as complete by Jeff  |  Mar 20, 2019 - 6:29am

    Post-Installation Sod Manual Watering Scheduled

  • Marked as complete by Jeff  |  Mar 20, 2019 - 6:29am

    Sod Installation

  • Marked as complete by Jeff  |  Mar 11, 2019 - 12:16pm

    Zoning Final Inspection

  • Marked as complete by Jeff  |  Mar 11, 2019 - 12:16pm

    Building Final Inspection

  • Marked as complete by Jeff  |  Mar 8, 2019 - 6:56am

    Electrical Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Mar 8, 2019 - 6:56am

    Zoning Final Inspection Requested

  • Marked as complete by Jeff  |  Mar 8, 2019 - 6:56am

    Building Final Inspection Requested

  • Marked as complete by Jeff  |  Mar 8, 2019 - 6:49am

    Plumbing Final Inspection

  • Marked as complete by Jeff  |  Mar 8, 2019 - 6:49am

    Plumbing Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Mar 8, 2019 - 6:49am

    HVAC Final Inspection

  • Marked as complete by Jeff  |  Mar 8, 2019 - 6:49am

    HVAC Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Mar 5, 2019 - 5:35pm

    Carpet Installation

  • Marked as complete by Jeff  |  Mar 5, 2019 - 5:35pm

    Sewer Clean-Out Cut-Down & Capping

  • Marked as complete by Jeff  |  Mar 5, 2019 - 1:19pm

    Kitchen Vent Hood Installation

  • Marked as complete by Jeff  |  Feb 27, 2019 - 6:32am

    Exterior Door Painting

  • Marked as complete by Jeff  |  Feb 27, 2019 - 6:32am

    Landscape Bed Installation

  • Marked as complete by Jeff  |  Feb 27, 2019 - 6:32am

    Blank-Plating of Media Wiring JCH-Verified

  • Marked as complete by Jeff  |  Feb 27, 2019 - 6:32am

    Appliance Package Delivery

  • Marked as complete by Jeff  |  Feb 27, 2019 - 6:32am

    Carpet Installation Scheduled

  • Marked as complete by Jeff  |  Feb 25, 2019 - 4:34pm

    Mailbox Constructed (If Feasible)

  • Phase Completed!  |  Feb 25, 2019 - 4:34pm

    Exterior Rough

  • Marked as complete by Jeff  |  Feb 25, 2019 - 4:33pm

    Electrical Final Meter & Service Installed

  • Posted by Jonathan Youngblood  |  Feb 15, 2019 - 2:42pm
    a
    asdf
  • Marked as complete by Jeff  |  Feb 15, 2019 - 11:27am

    Preliminary Detail Clean

  • Marked as complete by Jeff  |  Feb 15, 2019 - 11:27am

    Preliminary Detail Clean

  • Marked as complete by Jeff  |  Feb 11, 2019 - 8:25am

    Final Site Debris Clean-Up

  • Marked as complete by Jeff  |  Feb 11, 2019 - 8:25am

    Window Screen Installation

  • Marked as complete by Jeff  |  Feb 11, 2019 - 8:25am

    Adjacent Lot Dirt & Debris Removed

  • Marked as complete by Jeff  |  Feb 11, 2019 - 8:25am

    Final Site Grade

  • Marked as complete by Jeff  |  Feb 11, 2019 - 8:25am

    Exterior Wood Column Installation

  • Marked as complete by Jeff  |  Feb 5, 2019 - 3:02pm

    Seamless Guttering Installation

  • Scheduled by Jeff  |  Feb 2, 2019 - 10:06am

    Seamless Guttering Installation

  • Marked as complete by Jeff  |  Feb 2, 2019 - 10:05am

    Water Meter Adjustment (or N/A)

  • Marked as complete by Jeff  |  Feb 2, 2019 - 10:05am

    Outdoor Hand Railing Installed (or N/A

  • Marked as complete by Jeff  |  Feb 2, 2019 - 10:05am

    Yard Debris & Flag Removal

  • Marked as complete by Jeff  |  Feb 2, 2019 - 10:05am

    Window & Door Lintels Painted

  • Marked as complete by Jeff  |  Feb 2, 2019 - 10:05am

    Exterior Facade Expansion Joint Sealing

  • Scheduled by Jeff  |  Feb 2, 2019 - 9:58am

    Preliminary Detail Clean

  • Marked as complete by Jeff  |  Feb 1, 2019 - 2:52pm

    Sandy Loam Load Delivery

  • Marked as complete by Jeff  |  Feb 1, 2019 - 2:52pm

    Exterior Cornice & Trim Painting

  • Marked as complete by Jeff  |  Feb 1, 2019 - 2:52pm

    Curb & Form Haul

  • Scheduled by Jeff  |  Jan 30, 2019 - 11:47am

    Window Screen Installation

  • Marked as complete by Jeff  |  Jan 28, 2019 - 8:23am

    Flatwork Form Removal

  • Marked as complete by Jeff  |  Jan 28, 2019 - 8:23am

    ROWS Inspection Passed & JCH Verified

  • Marked as complete by Jeff  |  Jan 28, 2019 - 8:23am

    ROWS Inspection Requested & JCH-Verified

  • Marked as complete by Jeff  |  Jan 28, 2019 - 8:23am

    Flatwork Pour

  • Marked as complete by Jeff  |  Jan 28, 2019 - 8:23am

    Flatwork Relief Cuts & Caulking

  • Marked as complete by Jeff  |  Jan 28, 2019 - 8:23am

    Driveway Approach & CIty-Walk Inspection

  • Marked as complete by Jeff  |  Jan 21, 2019 - 4:17pm

    Pre-Flatwork Conduit Sleeving

  • Marked as complete by Jeff  |  Jan 21, 2019 - 4:17pm

    Flatwork Form Setup

  • Marked as complete by Jeff  |  Jan 18, 2019 - 12:50pm

    Cabinet Final & Adjustments

  • Marked as complete by Jeff  |  Jan 15, 2019 - 7:08am

    Glass & Mirror Installation

  • Scheduled by Jeff  |  Jan 9, 2019 - 9:35am

    Cabinet Final & Adjustments

  • Marked as complete by Jeff  |  Jan 9, 2019 - 9:33am

    Acid Wash of Brick Masonry Completion

  • Marked as complete by Jeff  |  Jan 9, 2019 - 9:33am

    Electrical Final Meter & Service Installed

  • Marked as complete by Jeff  |  Jan 1, 2019 - 10:14pm

    Electrical & Lighting Final Installation

  • Marked as complete by Jeff  |  Jan 1, 2019 - 10:13pm

    Flatwork Sand On Site

  • Scheduled by Jeff  |  Dec 28, 2018 - 3:49pm

    Flatwork Sand On Site

  • Scheduled by Jeff  |  Dec 28, 2018 - 3:47pm

    Flatwork Form Setup

  • Marked as complete by Jeff  |  Dec 28, 2018 - 3:46pm

    Flatwork Sand Ordered

  • Marked as complete by Jeff  |  Dec 20, 2018 - 4:43pm

    Garage Door Opener Installation

  • Marked as complete by Jeff  |  Dec 20, 2018 - 4:43pm

    Air Conditioning System Charged & JCH Verified

  • Marked as complete by Jeff  |  Dec 19, 2018 - 10:12am

    Security, Media, & Tech Final

  • Marked as complete by Jeff  |  Dec 17, 2018 - 8:30am

    Heat, Ventilation, & Air Conditioning Final Installation

  • Marked as complete by Jeff  |  Dec 17, 2018 - 8:30am

    Lighting Fixture Package Delivery

  • Marked as complete by Jeff  |  Dec 14, 2018 - 11:22am

    Plumbing Final Installation

  • Scheduled by Jeff  |  Dec 14, 2018 - 9:06am

    Garage Door Opener Installation

  • Marked as complete by Jeff  |  Dec 14, 2018 - 8:07am

    Backsplash & Remaining Wall Tile Installation

  • Marked as complete by Jeff  |  Dec 14, 2018 - 8:07am

    Permanent Keys Delivery & Secure Storage

  • Marked as complete by Jonathan  |  Dec 13, 2018 - 12:07pm

    Purchase Agreement Pricing Completed

  • Marked as complete by Jonathan  |  Dec 13, 2018 - 12:06pm

    Purchase Agreement Pricing Completed

  • Marked as complete by Jeff  |  Dec 13, 2018 - 8:35am

    Hardware Installation

  • Marked as complete by Jeff  |  Dec 7, 2018 - 12:40pm

    Laminate Counter Top Installation

  • Marked as complete by Jeff  |  Dec 7, 2018 - 10:11am

    Electrical Final Meter & Service Installation Scheduled

  • Scheduled by Jeff  |  Dec 6, 2018 - 4:25pm

    Lighting Fixture Package Delivery

  • Scheduled by Jeff  |  Dec 6, 2018 - 4:25pm

    Security, Media, & Tech Final

  • Scheduled by Jeff  |  Dec 6, 2018 - 4:25pm

    Plumbing Final Installation

  • Scheduled by Jeff  |  Dec 6, 2018 - 4:12pm

    Glass & Mirror Installation

  • Scheduled by Jeff  |  Dec 6, 2018 - 3:53pm

    Electrical & Lighting Final Installation

  • Marked as complete by Jeff  |  Dec 6, 2018 - 9:54am

    Solid Surface Counter Top Installation

  • Marked as complete by Jeff  |  Dec 6, 2018 - 9:53am

    Barn Door Installation Scheduled

  • Marked as complete by Jeff  |  Dec 5, 2018 - 8:27am

    Solid Surface Counter Top Templating

  • Marked as complete by Jeff  |  Dec 5, 2018 - 8:27am

    Laminate Counter Top Templating

  • Scheduled by Jeff  |  Dec 5, 2018 - 8:27am

    Hardware Installation

  • Marked as complete by Jeff  |  Dec 5, 2018 - 8:23am

    Mirror & Glass Templated

  • Marked as complete by Jeff  |  Dec 5, 2018 - 8:22am

    Attic Insulation Installation

  • Marked as complete by Jeff  |  Dec 5, 2018 - 8:22am

    Interior Stain & Painting

  • Scheduled by Jeff  |  Nov 26, 2018 - 5:09pm

    Backsplash & Remaining Wall Tile Installation

  • Scheduled by Jeff  |  Nov 26, 2018 - 5:08pm

    Laminate Counter Top Installation

  • Scheduled by Jeff  |  Nov 26, 2018 - 5:08pm

    Solid Surface Counter Top Installation

  • Scheduled by Jeff  |  Nov 26, 2018 - 5:08pm

    Solid Surface Counter Top Templating

  • Scheduled by Jeff  |  Nov 26, 2018 - 5:07pm

    Laminate Counter Top Templating

  • Marked as complete by Jeff  |  Nov 26, 2018 - 5:04pm

    Trim Back-Out & Detail

  • Marked as complete by Jeff  |  Nov 19, 2018 - 7:14am

    Trim Sweep & Haul Complete

  • Marked as complete by Jeff  |  Nov 15, 2018 - 5:23pm

    Final Exterior Door Installed

  • Marked as complete by Jeff  |  Nov 13, 2018 - 5:01pm

    Cabs Pre-Drilled for Hardware

  • Scheduled by Jeff  |  Nov 13, 2018 - 10:07am

    Cabs Pre-Drilled for Hardware

  • Scheduled by Jeff  |  Oct 31, 2018 - 11:41am

    Mirror & Glass Templated

  • Scheduled by Jeff  |  Oct 31, 2018 - 11:40am

    Surplus Trim Pick-Up

  • Scheduled by Jeff  |  Oct 31, 2018 - 11:39am

    Final Exterior Door Installed

  • Scheduled by Jeff  |  Oct 31, 2018 - 11:39am

    Trim Sweep & Haul Complete

  • Marked as complete by Jeff  |  Oct 31, 2018 - 11:38am

    Trim Sweep & Haul Scheduled

  • Phase Completed!  |  Oct 31, 2018 - 11:38am

    Insulation To Trim

  • Marked as complete by Jeff  |  Oct 31, 2018 - 11:38am

    Trim Sweep & Haul Scheduled

  • Marked as complete by Jeff  |  Oct 31, 2018 - 11:38am

    Builder Trim, Paint, & Detail Walk-Through

  • Marked as complete by Jeff  |  Oct 31, 2018 - 11:38am

    Trim Carpenter On Site - Door & Backout

  • Marked as complete by Jeff  |  Oct 31, 2018 - 11:38am

    Temporary Construction Heat Activated

  • Marked as complete by Jeff  |  Oct 29, 2018 - 11:30am

    Tile & Hardwood Flooring Take-Off & Ordered

  • Marked as complete by Jeff  |  Oct 29, 2018 - 11:30am

    Interior Trim & Doors On Site

  • Marked as complete by Jeff  |  Oct 29, 2018 - 11:30am

    Attic Access Installation Completion

  • Marked as complete by Jeff  |  Oct 29, 2018 - 11:30am

    Preliminary Stained Concrete Flooring Scheduled

  • Marked as complete by Jeff  |  Oct 29, 2018 - 11:29am

    Masonry Site-Haul Completion

  • Marked as complete by Jeff  |  Oct 26, 2018 - 11:35am

    Cabinet Delivery & Installation

  • Marked as complete by Jeff  |  Oct 26, 2018 - 8:32am

    Preliminary Wall Tile Completion

  • Marked as complete by Jeff  |  Oct 24, 2018 - 11:37am

    Temporary Exterior Door Hardware Installation

  • Marked as complete by Jeff  |  Oct 23, 2018 - 12:01pm

    Exterior Brick Masonry Completion

  • Scheduled by Jeff  |  Oct 22, 2018 - 9:37am

    Natural Gas Meter Installation Scheduled

  • Marked as complete by Jeff  |  Oct 22, 2018 - 9:36am

    Natural Gas Meter Installation Scheduled

  • Marked as complete by Jeff  |  Oct 22, 2018 - 9:36am

    Natural Gas Connections Completed & JCH-Verified

  • Marked as complete by Jeff  |  Oct 22, 2018 - 8:18am

    Post-Masonry Roof Flashing & Metal Capping Completion (Or N/A)

  • Marked as complete by Jeff  |  Oct 22, 2018 - 8:17am

    Hardscape/Flatwork Contractor Scheduled

  • Marked as complete by Jeff  |  Oct 22, 2018 - 8:17am

    Hardscape Design Notes Complete & Posted to CB

  • Scheduled by Jeff  |  Oct 22, 2018 - 8:17am

    Masonry Site-Haul Completion

  • Marked as complete by Jeff  |  Oct 22, 2018 - 8:15am

    Masonry Site-Haul Scheduled

  • Scheduled by Jeff  |  Oct 19, 2018 - 9:55am

    Interior Trim & Doors On Site

  • Scheduled by Jeff  |  Oct 19, 2018 - 9:50am

    Cabinet Delivery & Installation

  • Marked as complete by Jeff  |  Oct 19, 2018 - 9:49am

    Interior Trim & Doors On Site

  • Marked as complete by Jeff  |  Oct 19, 2018 - 9:49am

    Concrete Flooring Work Complete

  • Marked as complete by Jeff  |  Oct 19, 2018 - 9:49am

    Preliminary Flooring Completion

  • Marked as complete by Jeff  |  Oct 19, 2018 - 9:49am

    Garage Door Installation

  • Marked as complete by Jeff  |  Oct 19, 2018 - 9:49am

    Post Drywall Floor-Cleaning Completion

  • Marked as complete by Jeff  |  Oct 19, 2018 - 9:48am

    Interior Trim & Door Delivery Scheduled

  • Marked as complete by Jeff  |  Oct 17, 2018 - 9:24am

    Drywall Tape, Bed, & Texture Completion

  • Scheduled by Jeff  |  Oct 15, 2018 - 8:12am

    Preliminary Flooring Completion

  • Scheduled by Jeff  |  Oct 15, 2018 - 8:11am

    Exterior Brick Masonry Completion

  • Marked as complete by Jeff  |  Oct 15, 2018 - 8:10am

    Wall Tile Details Notated On Walls

  • Marked as complete by Jeff  |  Oct 15, 2018 - 8:09am

    Preliminary Floor &/or Wall Tile Scheduled

  • Marked as complete by Jeff  |  Oct 15, 2018 - 8:09am

    Phase 2 Design Session Notes Reviewed & Posted to Clickbuild

  • Marked as complete by Jeff  |  Oct 15, 2018 - 8:09am

    Natural Gas Line Installed

  • Marked as complete by Jeff  |  Oct 15, 2018 - 8:09am

    Phase 2 Design Session Completed

  • Marked as complete by Jeff  |  Oct 13, 2018 - 6:30pm

    Drywall Phase Site Clean-Up

  • Scheduled by Jeff  |  Oct 12, 2018 - 3:55pm

    Preliminary Wall Tile Completion

  • Scheduled by Jeff  |  Oct 8, 2018 - 8:24am

    Concrete Flooring Work Complete

  • Scheduled by Jeff  |  Oct 8, 2018 - 8:22am

    Drywall Phase Site Clean-Up

  • Marked as complete by Jeff  |  Oct 8, 2018 - 8:21am

    Garage Door Installation Scheduled

  • Marked as complete by Jeff  |  Oct 8, 2018 - 8:20am

    Sheetrock Installation Completion

  • Marked as complete by Jeff  |  Oct 8, 2018 - 8:20am

    Post Drywall Floor-Cleaning Scheduled

  • Marked as complete by Jeff  |  Oct 8, 2018 - 8:20am

    Concrete Flooring Work Scheduled

  • Marked as complete by Jeff  |  Oct 3, 2018 - 1:35pm

    Exterior Door Installation Scheduled

  • Marked as complete by Jeff  |  Oct 3, 2018 - 1:35pm

    Insulation Inspection Passed

  • Marked as complete by Jeff  |  Oct 3, 2018 - 1:35pm

    Insulation Inspection Requested

  • Marked as complete by Jeff  |  Oct 1, 2018 - 8:17am

    Masonry Sand On Site

  • Marked as complete by Jeff  |  Oct 1, 2018 - 8:16am

    Insulation Inspection Requested & Confirmed by Jeff

  • Marked as complete by Jeff  |  Sep 27, 2018 - 4:51pm

    Cabinet Delivery & Installation Scheduled

  • Scheduled by Jeff  |  Sep 26, 2018 - 3:22pm

    Sheetrock Installation Completion

  • Marked as complete by Jeff  |  Sep 26, 2018 - 3:22pm

    Drywall Phase Site Clean-Up Scheduled

  • Marked as complete by Jeff  |  Sep 26, 2018 - 3:21pm

    Drywall Material On Site

  • Marked as complete by Jeff  |  Sep 26, 2018 - 3:21pm

    Drywall Contractor Scheduled

  • Marked as complete by Jeff  |  Sep 26, 2018 - 3:21pm

    Drywall Material Ordered

  • Marked as complete by Jeff  |  Sep 26, 2018 - 3:21pm

    Window & Exterior Door Installation Completion

  • Phase Completed!  |  Sep 26, 2018 - 3:21pm

    Frame To Inspections

  • Marked as complete by Jeff  |  Sep 26, 2018 - 3:21pm

    Insulation Inspection Passed

  • Marked as complete by Jeff  |  Sep 26, 2018 - 3:21pm

    Wall Insulation & Seal Package Completion

  • Scheduled by Jeff  |  Sep 26, 2018 - 1:52pm

    Wall Insulation & Seal Package Completion

  • Marked as complete by Jeff  |  Sep 26, 2018 - 1:52pm

    Framer Punch-List Completion

  • Marked as complete by Jeff  |  Sep 26, 2018 - 1:52pm

    Electric Meter Installation Scheduled

  • Marked as complete by Jeff  |  Sep 26, 2018 - 1:52pm

    Electrical Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Sep 26, 2018 - 1:50pm

    Building Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Sep 26, 2018 - 1:50pm

    Building Rough-In Inspection Requested

  • Marked as complete by Jeff  |  Sep 26, 2018 - 1:50pm

    HVAC Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Sep 26, 2018 - 1:50pm

    HVAC Rough-In Inspection Contractor-Requested & JCH-Verified

  • Marked as complete by Jeff  |  Sep 26, 2018 - 9:16am

    Tech & Security Rough-In Completion

  • Marked as complete by Jeff  |  Sep 21, 2018 - 8:24am

    Supplemental Masonry Material On Site

  • Marked as complete by Jeff  |  Sep 21, 2018 - 8:23am

    Electrical Rough-In Inspection Requested & JCH Verified

  • Marked as complete by Jeff  |  Sep 21, 2018 - 8:23am

    Natural Gas Line Installation Scheduled

  • Marked as complete by Jeff  |  Sep 21, 2018 - 8:23am

    Water Meter Installed & Back-filled

  • Marked as complete by Jeff  |  Sep 20, 2018 - 11:04am

    Electrical Rough-In Completion

  • Marked as complete by Jeff  |  Sep 19, 2018 - 9:52am

    Brick On Site

  • Marked as complete by Jeff  |  Sep 19, 2018 - 9:52am

    Exterior Masonry Scheduled

  • Marked as complete by Jeff  |  Sep 19, 2018 - 9:52am

    Surplus Lumber Pickup

  • Marked as complete by Jeff  |  Sep 19, 2018 - 9:52am

    Frame Debris Site-Haul & Interior Sweep Completion

  • Marked as complete by Jeff  |  Sep 19, 2018 - 9:52am

    Temporary Exterior Door Installation

  • Marked as complete by Jeff  |  Sep 19, 2018 - 9:52am

    Cabinet Take-Off & Design Review

  • Marked as complete by Jeff  |  Sep 19, 2018 - 9:52am

    Super's On-Site Rough-In & Frame Review With Builder

  • Marked as complete by Jeff  |  Sep 19, 2018 - 9:52am

    Builder's Framing & Rough-In Review & Notation

  • Marked as complete by Jeff  |  Sep 18, 2018 - 1:19pm

    Sheetrock & Materials Order Scheduled For Delivery

  • Marked as complete by Jeff  |  Sep 17, 2018 - 11:57am

    Drywall Take-off Requested

  • Marked as complete by Jeff  |  Sep 17, 2018 - 8:59am

    Exterior Facade Materials Ordered

  • Marked as complete by Jeff  |  Sep 14, 2018 - 9:09am

    Masonry Sand Ordered

  • Marked as complete by Jeff  |  Sep 14, 2018 - 9:09am

    Supplemental Masonry Material Ordered

  • Scheduled by Jeff  |  Sep 14, 2018 - 9:08am

    Masonry Sand On Site

  • Scheduled by Jeff  |  Sep 14, 2018 - 8:49am

    Sheetrock & Materials Order Scheduled For Delivery

  • Marked as complete by Jeff  |  Sep 14, 2018 - 8:46am

    Trim & Interior Door Material Take-Off & Ordered

  • Scheduled by Jeff  |  Sep 14, 2018 - 8:22am

    Water Meter Installed & Back-filled

  • Marked as complete by Jeff  |  Sep 14, 2018 - 8:21am

    Final Exterior Door Ordered

  • Marked as complete by Jeff  |  Sep 14, 2018 - 8:21am

    Silt-Fencing & Storm-Water Run-Off Protection Verified

  • Marked as complete by Jeff  |  Sep 14, 2018 - 8:21am

    Plumbing Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Sep 14, 2018 - 8:21am

    Plumbing Rough Inspection Contractor-Requested & JCH-Verified

  • Marked as complete by Jeff  |  Sep 10, 2018 - 8:26am

    Plumbing Rough-In Completion

  • Marked as complete by Jeff  |  Aug 30, 2018 - 10:24am

    Roof Installation

  • Marked as complete by Jeff  |  Aug 30, 2018 - 10:23am

    HVAC Rough-In Completion

  • Marked as complete by Jeff  |  Aug 28, 2018 - 8:33am

    Lighting Selections Scheduled

  • Marked as complete by Jeff  |  Aug 28, 2018 - 8:20am

    Exterior Moisture Barrier Inspection Passed

  • Marked as complete by Jeff  |  Aug 28, 2018 - 8:20am

    Exterior Wall Sheathing Inspection Passed

  • Marked as complete by Jeff  |  Aug 28, 2018 - 8:20am

    Post-Design Session Pricing Audit

  • Marked as complete by Jeff  |  Aug 24, 2018 - 1:12pm

    Frame Debris Site-Haul & Interior Sweep Scheduled

  • Scheduled by Jeff  |  Aug 24, 2018 - 1:12pm

    Frame Debris Site-Haul & Interior Sweep Scheduled

  • Marked as complete by Jeff  |  Aug 24, 2018 - 1:03pm

    Exterior Wall Sheathing Inspection Requested

  • Marked as complete by Jeff  |  Aug 24, 2018 - 1:03pm

    Exterior Moisture Barrier Inspection Requested (Or N/A)

  • Marked as complete by Jeff  |  Aug 24, 2018 - 1:03pm

    Framing - Cornice & Detail Phase Completion

  • Marked as complete by Jeff  |  Aug 24, 2018 - 1:03pm

    Framing - Rafter & Decking Phase Completion

  • Scheduled by Jeff  |  Aug 22, 2018 - 8:46am

    Cabinet Take-Off & Design Review

  • Scheduled by Jeff  |  Aug 22, 2018 - 8:45am

    HVAC Rough-In Completion

  • Scheduled by Jeff  |  Aug 22, 2018 - 8:44am

    Plumbing Rough-In Completion

  • Scheduled by Jeff  |  Aug 22, 2018 - 8:44am

    Electrical Rough-In Completion

  • Scheduled by Jeff  |  Aug 22, 2018 - 8:43am

    Tech & Security Rough-In Completion

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:42am

    Tech & Security Rough-In Scheduled

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:42am

    Electrical Rough-In Scheduled

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:42am

    Framing - Joist Phase Completion

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:42am

    Window & Exterior Door Installation Scheduled

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:42am

    Roofing Material & Labor Scheduled

  • Scheduled by Jeff  |  Aug 22, 2018 - 8:41am

    Roof Installation

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:41am

    HVAC Rough-In Scheduled

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:41am

    Plumbing Rough-In Scheduled

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:36am

    Framing - Wall & Sheathing Phase Completion

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:35am

    Preliminary Wall Layout / Frame Started

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:35am

    Framing Lumber - Decking & Cornice Order

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:35am

    Framing Lumber - Joist & Rafter Order

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:35am

    Phase 2 Design Session Scheduled

  • Phase Completed!  |  Aug 22, 2018 - 8:35am

    Pad To Foundation

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:35am

    Phase 1 Design Session Notes Reviewed & Posted to Clickbuild

  • Marked as complete by Jeff  |  Aug 22, 2018 - 8:35am

    Phase 1 Design Session Completed

  • Marked as complete by Jeff  |  Aug 16, 2018 - 11:49am

    Framing Lumber - Wall Pack Order

  • Marked as complete by Jeff  |  Aug 10, 2018 - 1:34pm

    Trash Bin Constructed

  • Marked as complete by Jeff  |  Aug 10, 2018 - 1:34pm

    2nd Part Permit Obtained (Or N/A)

  • Marked as complete by Jeff  |  Aug 10, 2018 - 1:34pm

    Windows & Exterior Doors Ordered

  • Marked as complete by Jeff  |  Aug 10, 2018 - 1:34pm

    Foundation Form Removal

  • Marked as complete by Jeff  |  Aug 10, 2018 - 1:34pm

    Future Storm Shelter Location Poured/Not Poured Per Specifications

  • Marked as complete by Jeff  |  Aug 10, 2018 - 1:34pm

    Foundation Poured

  • Marked as complete by Jeff  |  Aug 10, 2018 - 1:34pm

    Dropped Shower Floor(s) Formed & Verified

  • Marked as complete by Jeff  |  Aug 10, 2018 - 1:34pm

    Ground Electrical Installed

  • Marked as complete by Jeff  |  Aug 7, 2018 - 11:18am

    Framing Wall-Pack Delivery Scheduled

  • Marked as complete by Jeff  |  Aug 7, 2018 - 11:17am

    Future Storm Shelter Location Formed & Verified

  • Marked as complete by Jeff  |  Aug 7, 2018 - 11:17am

    3rd Party Engineering Inspection

  • Marked as complete by Jeff  |  Aug 7, 2018 - 11:17am

    Post-Tension Foundation Cables Set

  • Marked as complete by Jeff  |  Aug 7, 2018 - 11:17am

    Porta-Potty Delivered

  • Marked as complete by Jeff  |  Aug 1, 2018 - 3:48pm

    Framing Plans Distributed to Framing Contractor

  • Marked as complete by Jeff  |  Aug 1, 2018 - 3:48pm

    Temp Electric Pole Installed

  • Marked as complete by Jeff  |  Jul 31, 2018 - 1:54pm

    Sewer Installed, Tapped, & Back-filled

  • Marked as complete by Jeff  |  Jul 31, 2018 - 1:54pm

    Ground Plumbing Inspection Passed

  • Marked as complete by Jeff  |  Jul 31, 2018 - 1:54pm

    Site Identification Sign Installed

  • Marked as complete by Jeff  |  Jul 31, 2018 - 1:54pm

    Pad Site Grading

  • Marked as complete by Jeff  |  Jul 31, 2018 - 9:12am

    Foundation Forms Constructed

  • Marked as complete by Jeff  |  Jul 31, 2018 - 9:11am

    Ground Plumbing Installed

  • Scheduled by Jeff  |  Jul 16, 2018 - 10:41am

    Foundation Forms Constructed

  • Scheduled by Jeff  |  Jul 16, 2018 - 10:40am

    Ground Plumbing Installed

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Foundation Plans Distributed To Plumbing & Foundation Contractors

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Phase 1 Design Session Scheduled

  • Phase Completed!  |  Jul 11, 2018 - 8:52am

    Start To Permit

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Issuance Of Building Permit

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Trash Bin Materials Ordered

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Site Drainage Analysis & Plan

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Final Design Notes Created

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Purchase Agreement Pricing Completed

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Purchase Agreement Signed by Client

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Purchase Agreement Signed by Builder

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Award Of Project To Trades & Contractors

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Lot Closing Scheduled

  • Marked as complete by Jeff  |  Jul 11, 2018 - 8:52am

    Pricing Updated From Pre-Con

  • Marked as complete by Jeff  |  Jun 8, 2018 - 8:43am

    Closing of Lot & Construction Financing Secured

  • Marked as complete by Jeff  |  Jun 8, 2018 - 8:43am

    Property Pins Located On Site

  • Posted by Jeff Click  |  Jun 8, 2018 - 8:43am
    It's about to become official.
    The application for permit, along with printed plans, have been submitted to the governing municipality for review. This usually takes between a few days to a week. Once approved, we are ready for construction on site! While the review is taking place, I am getting your project "in the queue" with my contractors and suppliers to ensure that everything is in order once the permit has been approved.

    Stand by for some fun visual progress on site in the coming days!

    -JC
  • Marked as complete by Jeff  |  Jun 8, 2018 - 8:43am

    Plans & Application Submitted for Permits

  • Marked as complete by Jeff  |  Jun 8, 2018 - 8:43am

    Window Take-Off & Bid Requested

  • Marked as complete by Jeff  |  Jun 8, 2018 - 8:43am

    Permit-Ready Plans Printed For Permitting

  • Marked as complete by Jeff  |  Jun 8, 2018 - 8:43am

    Framing Engineering & Material Take-Off Received

  • Marked as complete by Jeff  |  Jun 8, 2018 - 8:42am

    Client Pre-Con Scheduled

  • Marked as complete by Jeff  |  Jun 8, 2018 - 8:42am

    Draft of Plans Sent To Bank for Pre-Appraisal (or N/A)

  • Marked as complete by Jeff  |  Mar 20, 2018 - 4:23pm

    Construction Financing Budget Submitted to Bank

  • Marked as complete by Jeff  |  Mar 20, 2018 - 8:24am

    Window Take-Off & Bid Received

  • Marked as complete by Jeff  |  Mar 16, 2018 - 1:07pm

    Foundation Engineering Printed & Ready For Distribution

  • Marked as complete by Jeff  |  Mar 16, 2018 - 1:07pm

    Foundation Engineering JCH-Verified

  • Marked as complete by Jeff  |  Mar 16, 2018 - 1:07pm

    Foundation Engineering Complete

  • Scheduled by Jeff  |  Mar 13, 2018 - 9:59am

    Window Take-Off & Bid Received

  • Marked as complete by Jeff  |  Mar 13, 2018 - 9:12am

    Foundation Engineering Ordered

  • Marked as complete by Jeff  |  Mar 13, 2018 - 9:12am

    Pre-con Meeting Packet Created

  • New task added by Jonathan  |  Feb 16, 2018 - 5:05pm

    email debugging task

  • Marked as complete by Jeff  |  Feb 16, 2018 - 11:55am

    Final Pre-Con Redline Notes

  • Marked as complete by Jeff  |  Feb 16, 2018 - 11:51am

    Framing Engineering Ordered

  • Marked as complete by Jeff  |  Feb 16, 2018 - 11:51am

    Final Project Data Updated in CB

  • Marked as complete by Jeff  |  Feb 16, 2018 - 11:51am

    Final Plan Revisions JCH-Verified

  • Marked as complete by Jeff  |  Feb 16, 2018 - 11:51am

    Final Plan Revisions Received

  • Marked as complete by Jeff  |  Feb 16, 2018 - 11:51am

    Final Plan Revisions Submitted To Draftsman

  • Marked as complete by Jeff  |  Feb 16, 2018 - 11:51am

    Final Pre-Con Redline Notes

  • Marked as complete by Jeff  |  Feb 16, 2018 - 11:51am

    Draft of Plans Sent To Bank for Pre-Appraisal (or N/A)

  • Marked as complete by Jeff  |  Feb 12, 2018 - 12:55pm

    Jeff's Plan Review & Pre-Con Comments

  • Marked as complete by Jeff  |  Feb 12, 2018 - 12:55pm

    Pre-Con Plan Review with Client

  • Marked as complete by Jeff  |  Feb 12, 2018 - 12:55pm

    Initial Draft of Plans Received

  • Marked as complete by Jeff  |  Feb 12, 2018 - 12:55pm

    Plan Redline Submitted To Draftsman

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Draft of Plans Sent To Bank for Pre-Appraisal (or N/A)

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Interior Trim & Doors On Site

  • Marked as complete by Jonathan  |  Invalid date - Invalid date

    Purchase Agreement Pricing Completed

  • Marked as complete by Jonathan  |  Invalid date - Invalid date

    Purchase Agreement Pricing Completed

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Electrical Final Meter & Service Installed

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Preliminary Detail Clean

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Master Bathroom Drawer Won't Stay Closed

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Master Bathroom Drawer Won't Stay Closed