Progress feed:
15921 Aparados Way
← Back to Home Details
  • New task added by Jeff  |  Nov 14, 2019 - 10:50am

    Fence Installation

  • Marked as complete by Jeff  |  Nov 14, 2019 - 10:48am

    Correct Master Shower Door Issue

  • Marked as complete by Jeff  |  Nov 13, 2019 - 4:36pm

    General Ian Pre-POH Punch-List

  • Phase Completed!  |  Nov 13, 2019 - 4:36pm

    Punch To Closed

  • Marked as complete by Jeff  |  Nov 13, 2019 - 4:36pm

    Remaining Pre-Closing Walkthrough Items Assigned In Warranty Phase

  • Marked as complete by Jeff  |  Nov 13, 2019 - 4:36pm

    Closing-Day Final Paint Touch-Up

  • Marked as complete by Jeff  |  Nov 13, 2019 - 4:36pm

    Client Gift Basket Delivered & Displayed At Home

  • Marked as complete by Jeff  |  Nov 13, 2019 - 4:36pm

    Closing Day Pre-Closing Orientation With Client

  • Marked as complete by Jeff  |  Nov 13, 2019 - 4:36pm

    Plumbing Final Inspection

  • Marked as complete by Jeff  |  Nov 13, 2019 - 4:36pm

    Certificate of Occupancy Issued

  • Marked as complete by Jeff  |  Nov 13, 2019 - 4:36pm

    Pre-closing Walk & Client Orientation

  • Phase Completed!  |  Nov 13, 2019 - 4:36pm

    Paint To Finalled

  • Posted by Jeff Click  |  Nov 8, 2019 - 9:41am
    Black Friday Sale
    Black Friday For Your House & Family Vacation
    I wanted to bring this opportunity to your attention, as my appliance supplier (Known both as Hahn Appliances *and* Metro Appliances & More...same company) is having a 10% clearance on 11/14. This could be a good opportunity to grab a nice refrigerator, washer & dryer, or anything else you have on your wish list for the new pad.

    If you don't take advantage of this sale, remember I can always get you my wholesale pricing on those items at any other time, which would include delivery and installation. Feel free to hit me up with any model numbers of items you'd like quotes on.

    Also, I wanted to let you know in advance that I will be out for the week of the 18th-22nd for an overdue family getaway. I always leave with appropriate project progress scheduled to take place where possible, and I do have assistance in getting eyes on the jobs on site. I can also check-in via my remote site cameras to monitor progress. Note that I do build in cushion into construction schedules to allow a margin for things like this, weather, and holidays. Nonetheless, I wanted to make you aware of it in case you reached out to me and didn't hear back in my usual response window.

    Have a great weekend!

    | jC
  • New task added by Jeff  |  Oct 2, 2019 - 10:47am

    Correct Master Shower Door Issue

  • Marked as complete by Jeff  |  Oct 2, 2019 - 10:46am

    Replace defective patio fan blade

  • New task added by Jeff  |  Sep 9, 2019 - 9:50am

    Replace defective patio fan blade

  • Marked as complete by Jeff  |  Sep 6, 2019 - 4:12pm

    Plumbing Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Sep 6, 2019 - 4:11pm

    Carpet Installation

  • Scheduled by Jeff  |  Sep 4, 2019 - 7:04am

    Final-Final Clean

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Hardwood Transition Pieces

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Final-Final Clean

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Garage Baseboards, Doors, & Casings Wiped Down Post-Power Wash

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Surplus Tile Materials Gathered & Stored For Future Use

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Paint Touch Up Kit Created & Neatly Stored In Utility Room

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Garage, Drive, & Flatwork Power-Washing

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Trim & Hardware Punch List

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Permanent Keys Delivery & Secure Storage

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Address Panel Installed

  • Phase Completed!  |  Jul 31, 2019 - 6:41am

    Exterior Detail

  • Marked as complete by Jeff  |  Jul 31, 2019 - 6:41am

    Sod Installation

  • Marked as complete by Jeff  |  Jul 12, 2019 - 2:56pm

    Zoning Final Inspection

  • Marked as complete by Jeff  |  Jul 12, 2019 - 2:56pm

    Building Final Inspection

  • Marked as complete by Jeff  |  Jul 12, 2019 - 6:55am

    Stained Concrete Final

  • Marked as complete by Jeff  |  Jul 12, 2019 - 6:54am

    Exterior Door Weather Stripping & Threshold Adjustment

  • Marked as complete by Jeff  |  Jul 12, 2019 - 6:54am

    Post-Installation Sod Manual Watering Scheduled

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Surplus Trim Material Pick-Up

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Cabinetry Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Plumbing Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Masonry Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Flooring Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Solid Surface Counter Top Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Laminate Counter Top Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Cosmetic Surface Repair Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Glass & Mirror Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Window & Exterior Door Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    HVAC Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Tech & Media Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Drywall Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Paint Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Misc. Punch Items Needing Addressed

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Carpet Installation

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Debris & Materials Removed & Dirt Smoothed On Any Adjacent Property

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:18am

    Flowerbed Debris & Weed Removal & Mulch Refreshment

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:17am

    Drywall Punch List

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:17am

    Carpet Installation

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:17am

    Zoning Final Inspection Requested

  • Marked as complete by Jeff  |  Jul 11, 2019 - 10:17am

    Building Final Inspection Requested

  • Marked as complete by Jeff  |  Jul 11, 2019 - 9:09am

    Irrigation System Programming & Activation (or N/A)

  • Marked as complete by Jeff  |  Jul 11, 2019 - 7:08am

    Punch Lists Entered in CB & Transmitted To Respective Contractors

  • Marked as complete by Jeff  |  Jul 11, 2019 - 7:08am

    Outdoor Hand Railing Installed (or N/A

  • Marked as complete by Jeff  |  Jul 11, 2019 - 7:08am

    Sewer Clean-Out Cut-Down & Capping

  • Marked as complete by Jeff  |  Jul 11, 2019 - 7:08am

    Water Meter Adjustment (or N/A)

  • Marked as complete by Jeff  |  Jul 11, 2019 - 7:08am

    Adjacent Lot Dirt & Debris Removed

  • Marked as complete by Jeff  |  Jul 11, 2019 - 7:07am

    Yard Debris & Flag Removal

  • Marked as complete by Jeff  |  Jul 11, 2019 - 7:07am

    Landscape Bed Installation

  • Marked as complete by Jeff  |  Jul 11, 2019 - 7:07am

    Irrigation System Installation (or N/A)

  • Marked as complete by Jeff  |  Jul 8, 2019 - 5:51am

    Electrical Punch List

  • Marked as complete by Jeff  |  Jul 1, 2019 - 6:52am

    Electrical Final Inspection

  • Marked as complete by Jeff  |  Jul 1, 2019 - 6:52am

    Preliminary Detail Clean

  • Marked as complete by Jeff  |  Jul 1, 2019 - 6:52am

    Hand Railing & Banister Installation

  • Scheduled by Jeff  |  Jun 27, 2019 - 6:25am

    Irrigation System Programming & Activation (or N/A)

  • Marked as complete by Jeff  |  Jun 27, 2019 - 6:24am

    Preliminary Detail Clean

  • Marked as complete by Jeff  |  Jun 27, 2019 - 6:24am

    HVAC Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Jun 27, 2019 - 6:24am

    Electrical Final Inspection Requested & JCH-Confirmed

  • Marked as complete by Jeff  |  Jun 27, 2019 - 6:24am

    Blank-Plating of Media Wiring JCH-Verified

  • Marked as complete by Jeff  |  Jun 27, 2019 - 6:24am

    Sandy Loam Load Delivery

  • Marked as complete by Jeff  |  Jun 27, 2019 - 6:12am

    Carpet Installation

  • Scheduled by Jeff  |  Jun 24, 2019 - 2:04pm

    Electrical Punch List

  • Marked as complete by Jeff  |  Jun 24, 2019 - 12:17pm

    HVAC Final Inspection

  • New task added by Jeff  |  Jun 24, 2019 - 12:15pm

    Carpet Installation

  • Marked as complete by Jeff  |  Jun 21, 2019 - 6:15am

    Kitchen Vent Hood Installation

  • Marked as complete by Jeff  |  Jun 20, 2019 - 6:14am

    Security, Media, & Tech Final

  • Marked as complete by Jeff  |  Jun 20, 2019 - 6:14am

    Glass & Mirror Installation

  • Marked as complete by Jeff  |  Jun 20, 2019 - 6:14am

    Final Site Debris Clean-Up

  • Marked as complete by Jeff  |  Jun 20, 2019 - 6:13am

    Backsplash & Remaining Wall Tile Installation

  • Marked as complete by Jeff  |  Jun 17, 2019 - 8:41pm

    Purchase Agreement Pricing Completed

  • Marked as complete by Jeff  |  Jun 14, 2019 - 6:32am

    Natural Gas Connections Completed & JCH-Verified

  • Marked as complete by Jeff  |  Jun 14, 2019 - 6:32am

    Air Conditioning System Charged & JCH Verified

  • Marked as complete by Jeff  |  Jun 14, 2019 - 6:31am

    Electrical & Lighting Final Installation

  • Marked as complete by Jeff  |  Jun 13, 2019 - 2:19pm

    Attic Insulation Installation

  • Marked as complete by Jeff  |  Jun 13, 2019 - 2:19pm

    Window Screen Installation

  • Marked as complete by Jeff  |  Jun 12, 2019 - 5:49am

    Garage Door Opener Installation

  • Marked as complete by Jeff  |  Jun 11, 2019 - 10:32am

    Termite Certificate & Guarantee Received & Filed

  • Marked as complete by Jeff  |  Jun 11, 2019 - 9:55am

    Plumbing Final Installation

  • Marked as complete by Jeff  |  Jun 11, 2019 - 9:55am

    Heat, Ventilation, & Air Conditioning Final Installation

  • Marked as complete by Jeff  |  Jun 11, 2019 - 9:55am

    Appliance Package Delivery

  • Marked as complete by Jeff  |  Jun 11, 2019 - 9:55am

    Lighting Fixture Package Delivery

  • Marked as complete by Jeff  |  Jun 11, 2019 - 9:55am

    Laminate Counter Top Installation

  • Marked as complete by Jeff  |  Jun 11, 2019 - 9:55am

    Cabs Pre-Drilled for Hardware

  • Marked as complete by Jeff  |  Jun 10, 2019 - 6:53am

    Solid Surface Counter Top Installation

  • Marked as complete by Jeff  |  Jun 5, 2019 - 4:06pm

    Fireplace Final Installation

  • Marked as complete by Jeff  |  Jun 4, 2019 - 3:04pm

    Seamless Guttering Installation

  • Marked as complete by Jeff  |  Jun 4, 2019 - 3:04pm

    Final Site Grade

  • Marked as complete by Jeff  |  Jun 4, 2019 - 3:03pm

    Cabinet Final & Adjustments

  • Scheduled by Jeff  |  Jun 3, 2019 - 6:13am

    Carpet Installation

  • Scheduled by Jeff  |  Jun 3, 2019 - 6:12am

    Preliminary Detail Clean

  • Scheduled by Jeff  |  Jun 3, 2019 - 6:12am

    Cabinet Final & Adjustments

  • Scheduled by Jeff  |  Jun 3, 2019 - 6:11am

    Heat, Ventilation, & Air Conditioning Final Installation

  • Scheduled by Jeff  |  Jun 3, 2019 - 6:11am

    Window Screen Installation

  • Marked as complete by Jeff  |  Jun 3, 2019 - 6:08am

    Carpet Installation Scheduled

  • Marked as complete by Jeff  |  Jun 3, 2019 - 6:07am

    Interior Stain & Painting

  • Marked as complete by Jeff  |  Jun 3, 2019 - 5:45am

    Hardware Installation

  • Scheduled by Jeff  |  May 29, 2019 - 6:08am

    Final Site Debris Clean-Up

  • Scheduled by Jeff  |  May 29, 2019 - 6:08am

    Garage Door Opener Installation

  • Scheduled by Jeff  |  May 29, 2019 - 6:07am

    Glass & Mirror Installation

  • Scheduled by Jeff  |  May 29, 2019 - 6:07am

    Attic Insulation Installation

  • Scheduled by Jeff  |  May 29, 2019 - 6:06am

    Fireplace Final Installation

  • Scheduled by Jeff  |  May 29, 2019 - 6:05am

    Plumbing Final Installation

  • Scheduled by Jeff  |  May 29, 2019 - 6:05am

    Kitchen Vent Hood Installation

  • Scheduled by Jeff  |  May 29, 2019 - 6:04am

    Security, Media, & Tech Final

  • Scheduled by Jeff  |  May 29, 2019 - 6:04am

    Appliance Package Delivery

  • Scheduled by Jeff  |  May 29, 2019 - 6:02am

    Lighting Fixture Package Delivery

  • Scheduled by Jeff  |  May 29, 2019 - 6:01am

    Seamless Guttering Installation

  • Scheduled by Jeff  |  May 29, 2019 - 6:00am

    Surplus Trim Pick-Up

  • Scheduled by Jeff  |  May 29, 2019 - 5:59am

    Electrical & Lighting Final Installation

  • Marked as complete by Jeff  |  May 29, 2019 - 5:58am

    Mirror & Glass Templated

  • Marked as complete by Jeff  |  May 29, 2019 - 5:58am

    Exterior Door Painting

  • Marked as complete by Jeff  |  May 29, 2019 - 5:58am

    Window & Door Lintels Painted

  • Marked as complete by Jeff  |  May 29, 2019 - 5:58am

    Exterior Facade Expansion Joint Sealing

  • Scheduled by Jeff  |  May 28, 2019 - 8:25am

    Laminate Counter Top Installation

  • Scheduled by Jeff  |  May 28, 2019 - 8:24am

    Hardware Installation

  • Marked as complete by Jeff  |  May 28, 2019 - 8:21am

    Hardwood Flooring Installation

  • Marked as complete by Jeff  |  May 28, 2019 - 8:20am

    Laminate Counter Top Templating

  • Marked as complete by Jeff  |  May 28, 2019 - 8:20am

    Solid Surface Counter Top Templating

  • Marked as complete by Jeff  |  May 28, 2019 - 8:20am

    Trim Sweep & Haul Complete

  • Marked as complete by Jeff  |  May 28, 2019 - 8:20am

    Trim Back-Out & Detail

  • Marked as complete by Jeff  |  May 28, 2019 - 8:18am

    Exterior Cornice & Trim Painting

  • Marked as complete by Jeff  |  May 23, 2019 - 6:15am

    Final Exterior Door Installed

  • Marked as complete by Jeff  |  May 21, 2019 - 4:12pm

    Exterior Wood Column Installation

  • Scheduled by Jeff  |  May 21, 2019 - 3:46pm

    Exterior Cornice & Trim Painting

  • Marked as complete by Jeff  |  May 21, 2019 - 3:43pm

    Mirror & Glass Templated

  • Phase Completed!  |  May 21, 2019 - 3:43pm

    Insulation To Trim

  • Marked as complete by Jeff  |  May 21, 2019 - 3:43pm

    Builder Trim, Paint, & Detail Walk-Through

  • Marked as complete by Jeff  |  May 21, 2019 - 3:43pm

    Solid Surface Counter Top Templating

  • Marked as complete by Jeff  |  May 21, 2019 - 3:43pm

    Laminate Counter Top Templating

  • Phase Completed!  |  May 21, 2019 - 3:43pm

    Exterior Rough

  • Marked as complete by Jeff  |  May 21, 2019 - 3:42pm

    Phase 2 Design Session Notes Reviewed & Posted to Clickbuild

  • Marked as complete by Jeff  |  May 21, 2019 - 3:42pm

    Natural Gas Meter Installation Scheduled

  • Marked as complete by Jeff  |  May 21, 2019 - 3:42pm

    Phase 2 Design Session Completed

  • Scheduled by Jeff  |  May 21, 2019 - 3:01pm

    Backsplash & Remaining Wall Tile Installation

  • Scheduled by Jeff  |  May 21, 2019 - 2:55pm

    Solid Surface Counter Top Installation

  • Marked as complete by Jeff  |  May 17, 2019 - 6:31am

    Trim Sweep & Haul Scheduled

  • Scheduled by Jeff  |  May 17, 2019 - 6:30am

    Mirror & Glass Templated

  • Scheduled by Jeff  |  May 17, 2019 - 6:29am

    Laminate Counter Top Templating

  • Scheduled by Jeff  |  May 17, 2019 - 6:27am

    Solid Surface Counter Top Templating

  • Marked as complete by Jeff  |  May 17, 2019 - 6:26am

    Curb & Form Haul

  • Marked as complete by Jeff  |  May 17, 2019 - 6:25am

    Trim Carpenter On Site - Door & Backout

  • Marked as complete by Jeff  |  May 17, 2019 - 6:25am

    Outdoor Hand Railing Takeoff (Or N/A)

  • Marked as complete by Jeff  |  May 15, 2019 - 6:24am

    Cabinet Delivery & Installation

  • Marked as complete by Jeff  |  May 13, 2019 - 11:35am

    Interior Trim & Doors On Site

  • Marked as complete by Jeff  |  May 13, 2019 - 11:35am

    Laminate Counter Top Templating

  • Marked as complete by Jeff  |  May 13, 2019 - 11:35am

    Solid Surface Counter Top Templating

  • Scheduled by Jeff  |  May 13, 2019 - 10:15am

    Curb & Form Haul

  • Marked as complete by Jeff  |  May 13, 2019 - 10:12am

    Preliminary Wall Tile Completion

  • Marked as complete by Jeff  |  May 13, 2019 - 10:12am

    Preliminary Tile Flooring Completion

  • Scheduled by Jeff  |  May 13, 2019 - 9:49am

    Final Site Grade

  • Marked as complete by Jeff  |  May 13, 2019 - 9:48am

    Flatwork Form Removal

  • Marked as complete by Jeff  |  May 13, 2019 - 9:48am

    ROWS Inspection Passed & JCH Verified

  • Marked as complete by Jeff  |  May 13, 2019 - 9:48am

    ROWS Inspection Requested & JCH-Verified

  • Marked as complete by Jeff  |  May 13, 2019 - 9:48am

    Flatwork Relief Cuts & Caulking

  • Marked as complete by Jeff  |  May 13, 2019 - 9:48am

    Driveway Approach & CIty-Walk Inspection

  • Marked as complete by Jeff  |  May 13, 2019 - 9:48am

    Pre-Flatwork Conduit Sleeving

  • Marked as complete by Jeff  |  May 9, 2019 - 6:21pm

    Flatwork Pour

  • Scheduled by Jeff  |  May 7, 2019 - 6:02pm

    Interior Trim & Doors On Site

  • Scheduled by Jeff  |  May 7, 2019 - 6:01pm

    Cabinet Delivery & Installation

  • Marked as complete by Jeff  |  Apr 22, 2019 - 5:37am

    Post-Masonry Roof Flashing & Metal Capping Completion (Or N/A)

  • Marked as complete by Jeff  |  Apr 19, 2019 - 6:45am

    Wall Tile Details Notated On Walls

  • Marked as complete by Jeff  |  Apr 19, 2019 - 6:45am

    Hardscape Design Notes Complete & Posted to CB

  • Marked as complete by Jeff  |  Apr 19, 2019 - 6:45am

    Electrical Final Meter & Service Installed

  • Marked as complete by Jeff  |  Apr 19, 2019 - 6:45am

    Masonry Site-Haul Completion

  • Scheduled by Jeff  |  Apr 17, 2019 - 1:26pm

    Cabinet Delivery & Installation Scheduled

  • Marked as complete by Jeff  |  Apr 16, 2019 - 6:48pm

    Flatwork Form Setup

  • Marked as complete by Jeff  |  Apr 16, 2019 - 6:48pm

    Flatwork Sand On Site

  • Scheduled by Jeff  |  Apr 9, 2019 - 6:23am

    Flatwork Pour

  • Scheduled by Jeff  |  Apr 9, 2019 - 6:22am

    Flatwork Sand On Site

  • Marked as complete by Jeff  |  Apr 9, 2019 - 6:21am

    Flatwork Sand Ordered

  • Marked as complete by Jeff  |  Apr 9, 2019 - 6:21am

    Temporary Exterior Door Hardware Installation

  • Marked as complete by Jeff  |  Apr 9, 2019 - 6:21am

    Cabinet Delivery & Installation Scheduled

  • Scheduled by Jeff  |  Apr 9, 2019 - 6:20am

    Flatwork Form Setup

  • Scheduled by Jeff  |  Apr 5, 2019 - 6:45am

    Post-Masonry Roof Flashing & Metal Capping Completion (Or N/A)

  • Marked as complete by Jeff  |  Apr 5, 2019 - 6:38am

    Interior Masonry Completion

  • Marked as complete by Jeff  |  Apr 5, 2019 - 6:38am

    Hardscape/Flatwork Contractor Scheduled

  • Marked as complete by Jeff  |  Apr 5, 2019 - 6:38am

    Acid Wash of Brick Masonry Completion

  • Marked as complete by Jeff  |  Apr 5, 2019 - 6:38am

    Natural Gas Line Installed

  • Marked as complete by Jeff  |  Apr 4, 2019 - 10:40am

    Exterior Door Installation Scheduled

  • Marked as complete by Jeff  |  Apr 2, 2019 - 12:33pm

    Post Drywall Floor-Cleaning Completion

  • Marked as complete by Jeff  |  Apr 2, 2019 - 12:33pm

    Masonry Site-Haul Scheduled

  • Marked as complete by Jeff  |  Mar 29, 2019 - 10:40am

    Concrete Flooring Work Complete

  • Marked as complete by Jeff  |  Mar 28, 2019 - 7:33am

    Drywall Tape, Bed, & Texture Completion

  • Scheduled by Jeff  |  Mar 25, 2019 - 6:29am

    Drywall Tape, Bed, & Texture Completion

  • Marked as complete by Jeff  |  Mar 25, 2019 - 6:28am

    Garage Door Installation

  • Marked as complete by Jeff  |  Mar 25, 2019 - 6:28am

    Drywall Phase Site Clean-Up

  • Marked as complete by Jeff  |  Mar 25, 2019 - 6:27am

    Supplemental Masonry Material On Site

  • Marked as complete by Jeff  |  Mar 25, 2019 - 6:27am

    Masonry Sand On Site

  • Marked as complete by Jeff  |  Mar 25, 2019 - 6:27am

    Brick On Site

  • Marked as complete by Jeff  |  Mar 22, 2019 - 6:53am

    Attic Access Installation Completion

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:57am

    Garage Door Installation Scheduled

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Sheetrock Installation Completion

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Drywall Phase Site Clean-Up Scheduled

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Post Drywall Floor-Cleaning Scheduled

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Drywall Material On Site

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Attic Access Installation Scheduled

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Interior Trim & Door Delivery Scheduled

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Interior Masonry Scheduled (Or N/A)

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Insulation Inspection Passed

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:56am

    Drywall Material Ordered

  • Marked as complete by Jeff  |  Mar 21, 2019 - 6:55am

    Final Exterior Door Ordered

  • Phase Completed!  |  Mar 21, 2019 - 6:55am

    Frame To Inspections

  • Marked as complete by Jeff  |  Mar 19, 2019 - 4:40pm

    Electrical Final Meter & Service Installation Scheduled

  • Marked as complete by Jeff  |  Mar 19, 2019 - 4:40pm

    Stone On Site (Or N/A)

  • Marked as complete by Jeff  |  Mar 19, 2019 - 4:37pm

    Electric Meter Installation Scheduled

  • Marked as complete by Jeff  |  Mar 19, 2019 - 4:37pm

    Exterior Facade Materials Ordered

  • Marked as complete by Jeff  |  Mar 19, 2019 - 4:37pm

    Natural Gas Line Installation Scheduled

  • Marked as complete by Jeff  |  Mar 19, 2019 - 4:36pm

    Supplemental Masonry Material Ordered

  • Marked as complete by Jeff  |  Mar 19, 2019 - 4:36pm

    Masonry Sand Ordered

  • Scheduled by Jeff  |  Mar 19, 2019 - 4:22pm

    Supplemental Masonry Material Ordered

  • Marked as complete by Jeff  |  Mar 19, 2019 - 4:15pm

    Exterior Masonry Scheduled

  • Scheduled by Jeff  |  Mar 14, 2019 - 6:44am

    Concrete Flooring Work Complete

  • Scheduled by Jeff  |  Mar 14, 2019 - 6:44am

    Attic Access Installation Completion

  • Scheduled by Jeff  |  Mar 14, 2019 - 6:42am

    Preliminary Stained Concrete Flooring Scheduled

  • Scheduled by Jeff  |  Mar 14, 2019 - 6:42am

    Attic Access Installation Scheduled

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:41am

    Temporary Exterior Door Installation

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:40am

    Preliminary Floor &/or Wall Tile Scheduled

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:40am

    Preliminary Stained Concrete Flooring Scheduled

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:39am

    Drywall Contractor Scheduled

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:39am

    Trim & Interior Door Material Take-Off & Ordered

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:38am

    Insulation Inspection Requested

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:38am

    Temporary Exterior Door Installation

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:37am

    Trim & Interior Door Material Take-Off & Ordered

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:24am

    Insulation Inspection Requested & Confirmed by Jeff

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:24am

    Drywall Contractor Scheduled

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:23am

    Insulation Inspection Passed

  • Marked as complete by Jeff  |  Mar 14, 2019 - 6:23am

    Wall Insulation & Seal Package Completion

  • Marked as complete by Jeff  |  Mar 12, 2019 - 1:56pm

    Building Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Mar 12, 2019 - 1:56pm

    Building Rough-In Inspection Requested

  • Marked as complete by Jeff  |  Mar 12, 2019 - 1:56pm

    Plumbing Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Mar 7, 2019 - 6:12am

    Phase 2 Design Session Scheduled

  • Marked as complete by Jeff  |  Mar 7, 2019 - 6:08am

    HVAC Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Mar 7, 2019 - 6:08am

    Lighting Selections Scheduled

  • Marked as complete by Jeff  |  Mar 6, 2019 - 6:23am

    Drywall Material On Site

  • Marked as complete by Jeff  |  Mar 6, 2019 - 6:23am

    Surplus Lumber Pickup

  • Marked as complete by Jeff  |  Mar 6, 2019 - 6:22am

    Fireplace Gas Connections Complete & Verified

  • Scheduled by Jeff  |  Mar 6, 2019 - 6:22am

    Plumbing Rough Inspection Contractor-Requested & JCH-Verified

  • Marked as complete by Jeff  |  Mar 6, 2019 - 6:20am

    Plumbing Rough Inspection Contractor-Requested & JCH-Verified

  • Marked as complete by Jeff  |  Mar 6, 2019 - 6:20am

    Plumbing Rough-In Completion

  • Marked as complete by Jeff  |  Mar 6, 2019 - 6:20am

    Electrical Rough-In Inspection Passed

  • Marked as complete by Jeff  |  Mar 5, 2019 - 6:55am

    Silt-Fencing & Storm-Water Run-Off Protection Verified

  • Marked as complete by Jeff  |  Mar 5, 2019 - 6:54am

    Electrical Rough-In Inspection Requested & JCH Verified

  • Marked as complete by Jeff  |  Mar 5, 2019 - 6:54am

    Post-Design Session Pricing Audit

  • Marked as complete by Jeff  |  Mar 5, 2019 - 6:54am

    Phase 2 Design Session Scheduled

  • Phase Completed!  |  Mar 5, 2019 - 6:54am

    Pad To Foundation

  • Marked as complete by Jeff  |  Mar 5, 2019 - 6:54am

    Phase 1 Design Session Notes Reviewed & Posted to Clickbuild

  • Marked as complete by Jeff  |  Mar 5, 2019 - 6:54am

    Phase 1 Design Session Completed

  • Marked as complete by Jeff  |  Mar 4, 2019 - 5:34am

    Tech & Security Rough-In Completion

  • Marked as complete by Jeff  |  Feb 28, 2019 - 6:15am

    Electrical Rough-In Completion

  • Scheduled by Jeff  |  Feb 27, 2019 - 11:21am

    Drywall Material On Site

  • Marked as complete by Jeff  |  Feb 27, 2019 - 11:20am

    Sheetrock & Materials Order Scheduled For Delivery

  • Marked as complete by Jeff  |  Feb 27, 2019 - 11:20am

    Framer Punch-List Completion

  • Marked as complete by Jeff  |  Feb 26, 2019 - 9:51am

    HVAC Rough-In Inspection Contractor-Requested & JCH-Verified

  • Marked as complete by Jeff  |  Feb 26, 2019 - 9:51am

    Super's On-Site Rough-In & Frame Review With Builder

  • Marked as complete by Jeff  |  Feb 26, 2019 - 9:51am

    Builder's Framing & Rough-In Review & Notation

  • Marked as complete by Jeff  |  Feb 26, 2019 - 9:51am

    Water Meter Installed & Back-filled

  • Marked as complete by Jeff  |  Feb 26, 2019 - 9:51am

    Framing | Accent Panelling Installation

  • Marked as complete by Jeff  |  Feb 26, 2019 - 5:56am

    Cabinet Take-Off & Design Review

  • Marked as complete by Jeff  |  Feb 22, 2019 - 6:28am

    Fireplace Installation

  • Marked as complete by Jeff  |  Feb 22, 2019 - 6:27am

    HVAC Rough-In Completion

  • Marked as complete by Jeff  |  Feb 21, 2019 - 6:23am

    Frame Debris Site-Haul & Interior Sweep Completion

  • Marked as complete by Jeff  |  Feb 20, 2019 - 6:36am

    Exterior Moisture Barrier Inspection Passed

  • Marked as complete by Jeff  |  Feb 20, 2019 - 6:36am

    Exterior Wall Sheathing Inspection Passed

  • Marked as complete by Jeff  |  Feb 20, 2019 - 6:36am

    Roof Installation

  • Marked as complete by Jeff  |  Feb 15, 2019 - 11:26am

    Window & Exterior Door Installation Completion

  • Scheduled by Jeff  |  Feb 15, 2019 - 6:34am

    Frame Debris Site-Haul & Interior Sweep Completion

  • Scheduled by Jeff  |  Feb 15, 2019 - 6:33am

    Cabinet Take-Off & Design Review

  • Marked as complete by Jeff  |  Feb 15, 2019 - 6:32am

    Frame Debris Site-Haul & Interior Sweep Scheduled

  • Marked as complete by Jeff  |  Feb 14, 2019 - 7:17am

    Window & Exterior Door Installation Scheduled

  • Marked as complete by Jeff  |  Feb 14, 2019 - 7:17am

    Framing - Cornice & Detail Phase Completion

  • Scheduled by Jeff  |  Feb 10, 2019 - 9:56pm

    Tech & Security Rough-In Completion

  • Scheduled by Jeff  |  Feb 10, 2019 - 9:54pm

    Fireplace Installation

  • Marked as complete by Jeff  |  Feb 10, 2019 - 9:53pm

    Drywall Take-off Requested

  • Scheduled by Jeff  |  Feb 10, 2019 - 9:51pm

    Window & Exterior Door Installation Completion

  • Marked as complete by Jeff  |  Feb 10, 2019 - 9:47pm

    Exterior Moisture Barrier Inspection Requested (Or N/A)

  • Marked as complete by Jeff  |  Feb 10, 2019 - 9:47pm

    Exterior Wall Sheathing Inspection Requested

  • Marked as complete by Jeff  |  Feb 10, 2019 - 9:47pm

    Tech & Security Rough-In Scheduled

  • Marked as complete by Jeff  |  Feb 10, 2019 - 9:47pm

    Framing - Rafter & Decking Phase Completion

  • Marked as complete by Jeff  |  Feb 8, 2019 - 11:05am

    Roofing Material & Labor Scheduled

  • Marked as complete by Jeff  |  Feb 8, 2019 - 11:05am

    Framing - Joist Phase Completion

  • Marked as complete by Jeff  |  Feb 8, 2019 - 11:05am

    Framing Lumber - Decking & Cornice Order

  • Marked as complete by Jeff  |  Feb 8, 2019 - 11:05am

    2nd Part Permit Obtained (Or N/A)

  • Posted by Jeff Click  |  Feb 4, 2019 - 12:21pm
    Walls Up
    Status Update: Framing
  • Scheduled by Jeff  |  Feb 4, 2019 - 12:19pm

    Electrical Rough-In Completion

  • Scheduled by Jeff  |  Feb 4, 2019 - 11:57am

    Plumbing Rough-In Completion

  • Scheduled by Jeff  |  Feb 4, 2019 - 11:55am

    HVAC Rough-In Completion

  • Scheduled by Jeff  |  Feb 4, 2019 - 11:53am

    Roof Installation

  • Marked as complete by Jeff  |  Feb 4, 2019 - 11:53am

    Fireplace Installation Scheduled

  • Marked as complete by Jeff  |  Feb 4, 2019 - 11:52am

    Plumbing Rough-In Scheduled

  • Marked as complete by Jeff  |  Feb 4, 2019 - 11:52am

    HVAC Rough-In Scheduled

  • Marked as complete by Jeff  |  Feb 4, 2019 - 11:51am

    Electrical Rough-In Scheduled

  • Marked as complete by Jeff  |  Feb 4, 2019 - 11:51am

    Plumbing Rough-In Scheduled

  • Marked as complete by Jeff  |  Feb 4, 2019 - 11:51am

    HVAC Rough-In Scheduled

  • Marked as complete by Jeff  |  Feb 4, 2019 - 11:50am

    Framing - Wall & Sheathing Phase Completion

  • Marked as complete by Jeff  |  Feb 4, 2019 - 11:50am

    Preliminary Wall Layout / Frame Started

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:18am

    Framing Lumber - Joist & Rafter Order

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:18am

    Framing Lumber - Wall Pack Order

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:18am

    Framing Wall-Pack Delivery Scheduled

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:18am

    Future Storm Shelter Location Poured/Not Poured Per Specifications

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:18am

    Foundation Form Removal

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:18am

    Foundation Poured

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:17am

    Dropped Shower Floor(s) Formed & Verified

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:17am

    Future Storm Shelter Location Formed & Verified

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:17am

    Framing Plans Distributed to Framing Contractor

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:17am

    Concrete Flooring Work Scheduled

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:17am

    3rd Party Engineering Inspection

  • Marked as complete by Jeff  |  Jan 29, 2019 - 8:17am

    Sewer Installed, Tapped, & Back-filled

  • Scheduled by Jeff  |  Jan 25, 2019 - 9:26am

    Concrete Flooring Work Scheduled

  • Marked as complete by Jeff  |  Jan 15, 2019 - 9:02am

    Load of Sand For Plumbers Ordered

  • Marked as complete by Jeff  |  Jan 15, 2019 - 9:02am

    Post-Tension Foundation Cables Set

  • Marked as complete by Jeff  |  Dec 17, 2018 - 12:28pm

    Ground Plumbing Inspection Passed

  • Marked as complete by Jeff  |  Dec 17, 2018 - 12:27pm

    Ground Electrical Installed

  • Marked as complete by Jeff  |  Dec 17, 2018 - 12:27pm

    Foundation Forms Constructed

  • Marked as complete by Jeff  |  Dec 17, 2018 - 12:27pm

    Porta-Potty Delivered

  • Scheduled by Jeff  |  Dec 11, 2018 - 3:15pm

    Ground Electrical Installed

  • Marked as complete by Jeff  |  Dec 11, 2018 - 3:15pm

    Ground Plumbing Installed

  • Marked as complete by Jeff  |  Dec 11, 2018 - 3:15pm

    Trash Bin Constructed

  • Marked as complete by Jeff  |  Nov 26, 2018 - 11:48am

    Framing Engineering & Material Take-Off Received

  • Phase Completed!  |  Nov 26, 2018 - 11:48am

    Start To Permit

  • Scheduled by Jeff  |  Nov 16, 2018 - 9:27am

    Framing Engineering & Material Take-Off Received

  • Posted by Jeff Click  |  Nov 16, 2018 - 9:26am
    Your Design Notes
    It's Time To Design!
    We're at the point when it's time to start thinking in greater detail about your new home! Design Session 1 is upon us, which involves exterior finish selections, electrical and tech layout, flooring diagram, and more preliminary design decisions. Don't sweat these decisions! I'm here to guide you through making fantastic choices.

    Design sessions need to be scheduled during business hours, as often we need to walk a few doors down to look at materials from suppliers, or make phone calls to check on availability that other decisions depend on. DS1 can often be fully completed over a lunch hour meeting if that helps fit into your schedule better (it usually takes 1-2 hours, max).

    What are some days and times in the next 2 weeks that you have available? I'm looking forward to our next time together!

    | jC
  • Marked as complete by Jeff  |  Nov 16, 2018 - 9:26am

    Phase 1 Design Session Scheduled

  • Marked as complete by Jeff  |  Nov 16, 2018 - 9:26am

    Final Design Notes Created

  • Marked as complete by Jeff  |  Nov 16, 2018 - 9:26am

    Framing Engineering & Material Take-Off Requested

  • Marked as complete by Jeff  |  Nov 16, 2018 - 9:26am

    Final Project Data Updated in CB

  • Posted by Jeff Click  |  Nov 16, 2018 - 9:26am
    Check, Check, Build!
    The Plans Are Now Official
    Good news! The revised set of plans have been returned by the CAD Draftsman. I have personally cross-checked the new set of plans with our notes from the Plan Review Meeting Check-List, and all of our discussed modifications have been made to satisfaction.

    This means that the plans are now considered "official", and final. These plans are now passed on for foundation engineering, lumber/structural engineering, and window ordering.

    Lots of site progress to follow!

    | jC
  • Marked as complete by Jeff  |  Nov 16, 2018 - 9:26am

    Final Plan Revisions JCH-Verified

  • Marked as complete by Jeff  |  Nov 16, 2018 - 9:26am

    Final Plan Revisions Received

  • Scheduled by Jeff  |  Nov 14, 2018 - 12:25pm

    Trash Bin Materials Ordered

  • Marked as complete by Jeff  |  Nov 14, 2018 - 12:20pm

    Temp Electric Pole Installed

  • Marked as complete by Jeff  |  Nov 14, 2018 - 12:20pm

    Foundation Plans Distributed To Plumbing & Foundation Contractors

  • Marked as complete by Jeff  |  Nov 14, 2018 - 12:20pm

    Foundation Engineering Printed & Ready For Distribution

  • Marked as complete by Jeff  |  Nov 14, 2018 - 12:19pm

    Foundation Engineering JCH-Verified

  • Marked as complete by Jeff  |  Nov 14, 2018 - 12:19pm

    Foundation Engineering Complete

  • Marked as complete by Jeff  |  Nov 14, 2018 - 12:18pm

    Pricing Updated From Pre-Con

  • Marked as complete by Jeff  |  Nov 14, 2018 - 12:18pm

    Final Plan Revisions Submitted To Draftsman

  • Marked as complete by Jeff  |  Nov 14, 2018 - 12:18pm

    Award Of Project To Trades & Contractors

  • Marked as complete by Jeff  |  Nov 14, 2018 - 9:47am

    Final Pre-Con Redline Notes

  • Marked as complete by Jeff  |  Nov 14, 2018 - 9:47am

    Pre-Con Plan Review with Client

  • Marked as complete by Jeff  |  Nov 10, 2018 - 10:28am

    Window Take-Off & Bid Received

  • Marked as complete by Jeff  |  Nov 10, 2018 - 10:28am

    Window Take-Off & Bid Requested

  • Marked as complete by Jeff  |  Nov 10, 2018 - 10:28am

    Pre-con Meeting Packet Created

  • Marked as complete by Jeff  |  Nov 10, 2018 - 10:28am

    Client Pre-Con Scheduled

  • Scheduled by Jeff  |  Nov 7, 2018 - 8:36am

    Foundation Engineering Complete

  • Marked as complete by Jeff  |  Nov 7, 2018 - 8:29am

    Foundation Engineering Ordered

  • Marked as complete by Jeff  |  Nov 5, 2018 - 11:16am

    Site Identification Sign Installed

  • Marked as complete by Jeff  |  Nov 5, 2018 - 11:16am

    Trash Bin Materials Ordered

  • Scheduled by Jeff  |  Oct 30, 2018 - 11:13am

    Temp Electric Pole Installed

  • Marked as complete by Jeff  |  Oct 24, 2018 - 8:12am

    Pad Site Grading

  • Posted by Jeff Click  |  Oct 23, 2018 - 3:11pm
    Pad Site
    Pad Site
  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Issuance Of Building Permit

  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Closing of Lot & Construction Financing Secured

  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Site Drainage Analysis & Plan

  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Property Pins Located On Site

  • Posted by Jeff Click  |  Oct 22, 2018 - 1:52pm
    It's about to become official.
    The application for permit, along with printed plans, have been submitted to the governing municipality for review. This usually takes between a few days to a week. Once approved, we are ready for construction on site! While the review is taking place, I am getting your project "in the queue" with my contractors and suppliers to ensure that everything is in order once the permit has been approved.

    Stand by for some fun visual progress on site in the coming days!

    -JC
  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Plans & Application Submitted for Permits

  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Permit-Ready Plans Printed For Permitting

  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Jeff's Plan Review & Pre-Con Comments

  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Draft of Plans Sent To Bank for Pre-Appraisal (or N/A)

  • Marked as complete by Jeff  |  Oct 22, 2018 - 1:52pm

    Construction Financing Budget Submitted to Bank

  • Scheduled by Jeff  |  Oct 8, 2018 - 10:45am

    Pad Site Grading

  • Marked as complete by Jeff  |  Sep 21, 2018 - 11:41am

    Initial Draft of Plans Received

  • Marked as complete by Jeff  |  Sep 21, 2018 - 11:41am

    Plan Redline Submitted To Draftsman

  • Marked as complete by Jeff  |  Sep 21, 2018 - 11:41am

    Lot Closing Scheduled

  • Marked as complete by Jeff  |  Sep 17, 2018 - 8:36am

    Purchase Agreement Signed by Builder

  • Marked as complete by Jeff  |  Sep 17, 2018 - 8:36am

    Purchase Agreement Signed by Client

  • Marked as complete by Jeff  |  Sep 17, 2018 - 8:36am

    Purchase Agreement Pricing Completed

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Laminate Counter Top Templating

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Solid Surface Counter Top Templating

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Purchase Agreement Pricing Completed

  • Marked as complete by Jeff  |  Invalid date - Invalid date

    Preliminary Detail Clean